Operating instruction: B013 Edition: 01/2015
Subject to alterations.
16
6
Maintenance work
Before operating the tool, the following maintenance work must be carried out each time to ensure
that the tool works properly. If damage is established during maintenance that cannot be rectified
on site, the tool must no longer be used and must be sent for repair to the manufacturer.
Check the following each time before use:
•
Plug and lead for damage
•
Check that body and protective parts are not damaged and function properly
•
Dust bag must be clean
•
Check the grinding table for cleanliness
•
Check grinding belt for wear and tear
Check every twelve months:
According to VDE-guideline 0701/0702 or the appropriate electrical engineering norms in the
individual country, electrical tools must be checked every twelve months in each company.
6.1
Wear parts
Materials and parts that are enumerated in the technical instructions as wear parts are excluded
from the guarantee.
7
Disassembling and Disposal
The disassembling in individual components can only be effected by competent staff with a good
knowledge of machine building.
Please sort out the machine according to the respective materials (metal, plastics, electronic) and
recycle them.
Material number
Designation
on request
Grinding belts size 80, 533 x 76 mm