
23
© Munters Corporation, September 2019
QM1078r1
Step 27
Use a straight edge or level to check alignment of Propeller Sheave,
Tensioner Pulley and Motor Sheave. If needed, adjust position of Motor
Sheave so the 3 pulleys line up. Once Motor Sheave is aligned tighten
the set screw to 75 in-lbs [9 N-m] torque.
See Figure 27.
Installation Instructions
Chapter 2
Propeller Sheave
Figure 27
Tensioner Pulley
Motor Sheave
Level
Step 28A
Slide V-belt over Propeller and install by wrapping
it around 2 smaller pulleys and starting it over
larger Sheave. Continue rolling it onto the larger
Sheave until it fits into groove.
See Figure 28A.
If desired the 2 drain holes in the Orifice Panel
can be plugged using (2) Hole Plugs [KK].
Figure 28A
Step 26B
Using channel locks and/or a hammer twist the motor bracket stiffener so that the holes in the bracket lay flat
against the framing. Then attach bracket to framing using (1) Lag Screw [LL].
See Figure 26B.
Figure 26B
Frame
Stiffener
Lag Screw [LL]
Drain Holes