© Munters AB, 2020
109
•
•
•
13.2.1
D
EFINING
B
ASIC
V
ENTILATION
In this configuration, Trio raises the minimum ventilation from 10% at Level One to 100% at Level 10.
In Mapping and Defining the Input Output Devices, page 48 map relays and analog output
ports to fans (including the capacity), inlets, and stir fans as required. Only mapped devices
show up in the following screens.
1. Go to Climate > Ventilation.
NOTE
At this point, fans do not appear.
2. Click
.
3. Click a relay-controlled fan that you want to activate. 1) A box appears around the fan. 2) A fan
appears in the upper right.
Содержание Rotem Trio 20
Страница 20: ... Munters AB 2020 20 Figure 6 Relay and port numbering ...
Страница 44: ... Munters AB 2020 44 ...
Страница 99: ... Munters AB 2020 99 Refer to Tunnel Ventilation page 123 for more details ...
Страница 110: ... Munters AB 2020 110 4 Click the fan in the upper right Both fans turn blue 5 Define fans as required ...
Страница 141: ... Munters AB 2020 141 If an outside temperature sensor is enabled map timers to it if required ...
Страница 160: ... Munters AB 2020 160 23 3 2TRIO 20 CONTAINER SPARE PARTS ...
Страница 162: ... Munters AB 2020 162 23 3 3TRIO 20 DOOR CARDS SPARE PARTS ...
Страница 164: ... Munters AB 2020 164 23 3 4TRIO 20 MAIN CONTAINER SPARE PARTS ...
Страница 170: ... Munters AB 2020 170 Card Description Munters Ordering Number TUBES AND FILTERS FOR RPS NO RPS CARD 999 99 00503 ...
Страница 186: ... Munters AB 2020 186 Figure 33 Relay and port numbering 26 2 3POWER Figure 34 Power ports ...
Страница 199: ... Munters AB 2020 199 2 Insert and secure the SMA connector ...
Страница 202: ... Munters AB 2020 202 example only ...