33
|
© Munters AB, 2020
Place v-belt on the pulley and
then
rotate
the
propeller
clockwise in order to tighten the v-
belt
on
the
pulley.
Check
tensioning: right tensioning is
obtained when tension over the v-
belt corresponds to a resonance
frequency of 35-41 Hz measured
by a v-belt tension meter like the
“Trummy 2” manufactured by Fag
or the “Ten-Sit” manufactured by
Sit.
EC52 CONE DISCHARGE ASSEMBLING
Assemble the cone sectors (
ref.
2
) as shown in the pictures,
inserting the wings of the first
sector in the slots of the second
one. Repeat the operation for all
four sectors.
To obtain the discharge cone join
the first sector with the last one.
Содержание EC50
Страница 4: ...4 Munters AB 2020 1 SPARE PART LIST EC52 EC52 exploded view ...
Страница 5: ...5 Munters AB 2020 DETAIL A ...
Страница 38: ...38 Munters AB 2020 4 SPARE PART LIST EC50 EC50 exploded view ...
Страница 39: ...39 Munters AB 2020 DETAIL A ...