DIMENSIONED DRAWINGS
I
INSTALLATION
CHOICE OF INSTALLATION SITE
Before installing the unit, agree with the customer the site
where it will be installed,taking the following points into
consideration:
-check that the fixing points are adequate to support the
weight of the unit;
-payscrupulous respect to safety distances between the
unit and other equipment or structures to ensure that air
entering the unit and discharged by the fans is free to
circulate.
POSITIONING
Before handling the unit,check the capacity of the lifting
equipment used,respecting the instructions on the
packaging.
Tomove the unit in the horizontal,make appropriate use of
a lift truck or similar,bearing in mind the weight distribution
of the unit.To lift the unit,insert tubes long enough to allow
positioning of the lifting slings and safety pins in the feet on
the unit.
To avoid the slings damaging the unit,place protection
between the slings and the unit.Position the unit in the
site indicated by the customer.Place either a layer of
rubber (min.thickness 10 mm) or vibration damper feet
(optional) between the base and support surface.Fix the
unit,making sure it is level and that there is easy access
to hydraulic and electrical components.If the site of
installation is exposed to strong winds,fix the unit
adequately to the support surface using tie rods if
necessary.If a heat pump unit is being installed,make
sure the condensate is drained using the drain hose
supplied as standard.Prevent leaves,branches or snow
from accumulating around the unit.These could reduce
the efficiency of the unit.
I
1327
900
970
600
348
320
400
360
4