4.3
Testin
g
o
f
drain pipin
g
-
Check whether the drainpipe is unhindered.
-
New built house should have this test done before paving the ceiling.
The unit with pump.
1. Remove the test cover, and stow about 2000ml water to the
water pan.
2. Operate the air conditioner in "COOLING" mode. The sound
of the drain pump shall be heard. Check whether the water is
discharged well (1 min lag is possible, according to the length
of the drain pipe), and check whether the water leaks from the
joints.
3. Power off the air conditioner and recover the cap.
Test cap
Stow tube
4.4 F
resh
air du
c
t installation
Dimension :
Duct joint for fresh air
MODEL
125mm
160mm
90mm
80mm
80mm
Motor and drain pump maintenan
c
e
(Take rear ventilated as example)
Motor maintain:
1. Take off the ventilated panel.
2. Take off the blower housing.
3. Take off the motor.
Mofor
Blower housing
entilated panel
Pump maintenance:
1. Screw off four screws from drain pump.
2. Plug off pump power supply and water level switch cable.
3. Take off pump.
Pump
INSTALLATION MANUAL
73
MUCR-12-H8
MUCR-48/60-H8T
MUCR-18/24/30/36/48-H8
CLOSED
O
P
E
N
C
LO
S
E
D
OPEN
Содержание MUCR-12-H8
Страница 289: ...289 ...
Страница 290: ...www mundoclima com C PROVENZA 392 P2 08025 BARCELONA SPAIN 34 93 446 27 80 ...