
71
GAS-FIRED BOILER
Boiler Manual
BOILER ST
ART UP REPORT
Light Off Activities
1) Fill the heating system
Check all piping and gas connections, verify they are all tight
Pressurize System (12-15 PSI)
_____PSI
What percentage of propylene glycol is installed in the system (0-50%)
____%
Verify near heater piping is properly supported
2) Check Gas Pipe
Leak test using locally approved methods (consult jurisdictional code book)
Check incoming gas pressure (3.5" to 14" W.C.)
____in w.c.
Static
What is the "drop" on light off (No more than 1" W.C.)
____in w.c.
Dynamic
3) Check Combustion
Check and adjust (if necessary) carbon dioxide content
____% CO2
High Fire
____%CO2
Low Fire
Check and adjust (if necessary) carbon monoxide content
____ppm CO
High Fire
____ppm CO
Low Fire
4) Verify System Operation
Turn up thermostat to verify wiring connections
5) Record Ionization Current
Check
µ
A reading at d7 on the status menu (see start-up section)
____
µ
A
H
igh Fire
____
µ
A
Low Fire
6) Record System Settings
Record heating curve (with optional Vision One kit, record steps)
____*8
____*9
____*10
____*11
7) Indirect water heater
Verify safety and operation of the Super-Stor Indirect water heater, record setttings
____de
____dh
8) Convert the boiler
If necessary convert the heater to the proper type of gas (always use proper kit)
Locate the stickers in the appropriate locations on the heater
Verify Combustion settings after gas conversion, Carbon Dioxide
____% CO2
High Fire
____% CO2
Low Fire
Verify Combustion settings after gas conversion, Carbon Monoxide
____ppm CO
High Fire
____ppm CO
Low Fire
Mail in the conversion registration
Notes:
Date completed _______________
Add Water to prime condensate hose
Содержание Gas-Fired Hot Water Boiler
Страница 11: ...10 GAS FIRED BOILER Boiler Manual DIMENSIONS 80M 140M 199M Figure 2 2 Figure 2 3...
Страница 51: ...50 GAS FIRED BOILER Boiler Manual PART 9 FIELD WIRING CONTINUED Fig 9 4 Fig 9 3 Fig 9 1 Fig 9 2...
Страница 52: ...51 GAS FIRED BOILER Boiler Manual PART 9 FIELD WIRING CONTINUED Fig 9 5...
Страница 77: ...76 MAINTENANCE NOTES...
Страница 78: ...77 MAINTENANCE NOTES...
Страница 79: ...78 MAINTENANCE NOTES...
Страница 80: ...2007 Heat Transfer Products Inc www HTproducts com LP 185 REV 12 10 07...