11
© Multilink Inc. 2020
•
All Rights Reserved
© Multilink Inc. 2020
•
All Rights Reserved
Multilink Inc.
580 Ternes Ln. | Elyria,OH 44035 | 440.366.6966 | www.gomultilink.com
Wiring
Connect the MAINS, LOAD, GEN, and monitor wiring to the SATS according to the following procedure. Re-
fer to Figs. 4-1 and 4-2 for control and connector positions.
CAUTION
To reduce the risk of fire, connect only to a circuit provided with 20A maximum branch circuit over-
current protection in accordance with the National Electrical code, ANSI/NFPA 70 and the Canadian
Electrical Code, Part 1, C22.1
1. Operate the AC line circuit breaker in the service entrance box to the OFF position. If the SATS is
located at a head end or other customer premise site, ensure that the branch circuit breaker chosen
to protect the AC receptacle for the SATS is operated to the OFF position.
2. Operate the UPS Input circuit breaker on the SATS to the OFF position.
3. Wire the SATS as shown in Fig 4-1. Recommended wire strip length of 7mm. Secure the screw termi-
nal contacts with a max torque of 7.0Lbf-in.
Fig. 4-1 SATS and EP1100 (Line Interactive) wiring example