Muller 110 Скачать руководство пользователя страница 4

Fault

 

Measures

 

OPSO falls 
continuously or 
cannot be unlocked

 

Pressure regulator is defective, 
please replace.

 

 
 

NOTE! 
Before carrying out assembly and repair work, 
please observe Section 10

 

 

9.   Repairs 

 
In order to ensure the proper functioning of the installation 
under normal operating conditions, it is recommended to 
replace the device before 10 years have elapsed since the 
date of manufacture. 
The 10 years is a recommendation that can be replaced by 
national laws or technical regulators, taking into account the 
operating conditions of integrated safety devices and 
maintenance schedules. 
 

According to DGUV 79: 

The Contractor must ensure that parts of consumable 
equipment that are subject to wear and aging are replaced 
after a maximum of 8 years. This does not apply if the proper 
condition has been confirmed by an expert. 
 

10.   Warranty 

The scope and period of warranty is defined in the version of 
the "General Terms and Conditions" of Müller Gastechnik 
GmbH valid at the time of delivery. 
 
All information and notes in this manual have been compiled 
taking into account the applicable standards and regulations, 
the state of the art and our many years of expertise and 
experience. The manufacturer accepts no liability for 
damages due to: 

 

Non-compliance with the instructions 

 

Unintended use 

 

Use of untrained personnel 

 

Unauthorised conversion 

 

Technical changes 

 

Use of non-approved spare parts. The actual scope 
of delivery may differ from the explanations and 
illustrations described here in the case of special 
versions, the use of additional ordering options or 
due to the latest technical changes. 

 
 
 
 
 
 

11.   Drawing (BRK-110/111) 

 

 

 

1.  inlet connection Pol 
2.  OPSO (SAV) vent opening 
3.  overpressure safety shut-off device OPSO (SAV) 
4.  visual display OPSO 
5.  ventilation outlet regulator 

(connection for insect screen) Internal overpressure 
safety relief valve 

6.  low pressure regulator 2nd stage 
7.  outlet connection G 1/2 "IG 
8.  test device back pressure, 8mm hose connection from 

"Müller test device” 

9.  test device inlet pressure G 1/4" (for type 111 via 

emergency supply connection G 3/8" LH-KH 

10.  medium pressure regulator 1st stage 

 
 
 

 

 

1.  inlet connection Pol 
2.  ventilation opening medium pressure regulator 
3.  medium pressure regulator 1st stage 
4.  low pressure regulator 2nd stage 
5.  outlet connection G 1/2 "IG 
6.  test device back pressure, 8mm hose connection 

from "Müller test device" 

7.  ventilation blow-off opening regulator (connection for 

insect screen) internal overpressure safety blow-off 
valve 

8.  test device inlet pressure G 1/4" (for type 111 via 

emergency supply connection G 3/8" LH-KH 

9.  vent opening OPSO (SAV) 
10.  visual display OPSO 

 

12.   Technical specification (BRK-110/111) 

 

Max. permissible 
pressure: 

PS 25 
 

Response 
pressure 
OPSO: 

132 
mbar 

Nominal flow 
Mg:  

10 kg/h 
 

Response 
pressure PRV: 

150 
mbar 

Inlet pressure 
p: 

3-16 bar 
 

Connection at 
inlet 

Pol 
 

Nominal outlet 
pressure pd: 

50 mbar 
 

Connection at 
outlet 

G 1/2” 
 

Pressure loss: 
 

ΔP 5

 

 

Temperature 
range 

-40 °C 
to 
+80 °C 

 

Содержание 110

Страница 1: ...to make technical modifications and improvements at any time The use of these operating and assembly instructions requires the user to be qualified as described in section 2 3 Qualified personnel The user must be instructed according to the operating and assembly instructions The operating and assembly instructions must always be available at the place of use of the plant 1 1 Information The tank ...

Страница 2: ...rmal operation and is designed to automatically release the gas flow with limited flow when the pressure in the system to be protected reaches the set pressure This is relieved via the regulator s venting port It closes again automatically when the pressure drops below the set pressure The outlet opening must be protected against rainwater It is important to note that pressure regulators which are...

Страница 3: ...ply and consumption system is to be taken out of operation all shut off valves must be closed and the pipe system drained All open connections must be secured with a suitable seal 7 3 Recommissioning When recommissioning the regulator make sure that all the relevant steps are repeated as described in section 6 1 to section 6 3 If recommissioning is not possible the manufacturer must be informed 7 ...

Страница 4: ... non approved spare parts The actual scope of delivery may differ from the explanations and illustrations described here in the case of special versions the use of additional ordering options or due to the latest technical changes 11 Drawing BRK 110 111 1 inlet connection Pol 2 OPSO SAV vent opening 3 overpressure safety shut off device OPSO SAV 4 visual display OPSO 5 ventilation outlet regulator...

Отзывы: