Mounting and installation
Installing the on-board integrated display/controller
4
30283620-02-EN
V3.20151130_rev.2
13
Mounting and installation
Installing the on-board integrated display/controller
DRILL-Control - rear view
Attachment for the bracket.
8-pin flange socket.
ASD interface for the use of SECTION-
Control.
Power connection cable
For connection to the battery connection
cable.
USB port
To connect a USB memory device.
39-pin multipole connector
To connect the junction box.
1.
Screw the bracket onto the on-board integrated display/controller.
2.
Attach the bracket with the on-board integrated display/controller in the vehicle cab
3.
Connect the on-board integrated display/controller with the junction box.
4.
Connect the power connection cable with the battery connection cable.
Installing the sensors on the implement
The following sensors can be installed on the implement:
Purpose
Sensor type – according to the operating
mode
Revolution sensor
Hall element sensor
Fill level sensor
Capacitive sensor
Work position sensor
Reed contact sensor
Vehicle speed sensor
Radar sensor
4
4.1
Procedure
4.2