Prima 120 AOS Manual
Mugnaini Imports, Inc.
10
STEP 6 – INSTALLING THE FLUE MANIFOLD
Place flue manifold on arch and mark fro screws. Drill 2 holes with masonry bit (1/8”w – 1
¼
”d). Attach flue
manifold with provided screws. Mortar base of metal manifold (
½
” – 2”).
Note: Ensure the flue manifold is level on top of crown elements.
STEP 7 – INSULATION
Cover the entire oven with 2-layers of 1” or 1-layer of 2” Thermal Insulation Blanket (Item K).