Mugnaini Medio 100 Скачать руководство пользователя страница 11

Residential Factory-Assembled Manual 

Mugnaini Imports, Inc.   

11

WarnIng

FOLLOW THE COMPLETE CURING SCHEDULE BEFORE COOkING IN THIS OVEN.  
FAILURE TO DO SO MAY CAUSE PERMANENT DAMAGE TO YOUR OVEN AND WILL  
VOID THE WARRANTY.

DO NOT START A FIRE OR INITIATE THE CURING PROCESS UNTIL THE EXHAUST VENT 
HAS BEEN INSTALLED AND APPROVED BY THE LOCAL BUILDING OR FIRE OFFICIALS.

NEVER USE GASOLINE, GASOLINE TYPE LANTERN FUEL, kEROSENE, CHARCOAL 
LIGHTER FLUID OR SIMILAR LIQUIDS TO START OR “FRESHEN UP” A FIRE IN THIS OVEN. 
kEEP ALL SUCH LIQUIDS WELL AWAY FROM THE OVEN WHEN IN USE.

NEVER USE WATER TO LOWER TEMPERATURE INSIDE THE OVEN OR TO EXTINGUISH  
THE FIRE.

USE SOLID WOOD FUEL ONLY. DO NOT USE RESINOUS WOOD SUCH AS PINE  
OR SPRUCE.

CurIng Your MugnaInI WooD-fIreD oven

This section covers the following Mugnaini series models:

Piccolo 80 

  Medio 100 

  Medio 110 

  Prima 100  

♦ 

 Prima 120

reaD all InsTruCTIons 

before sTarTIng a fIre anD CurIng Your oven

for use WITh solID WooD fuel onlY

for Your safeTY

DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPORS OR LIQUIDS IN THE 
VICINITY OF THIS OR ANY OTHER APPLIANCES.

Содержание Medio 100

Страница 1: ...ACCORDANCE WITH THESE INSTRUCTIONS Factory Assembled residential wood fired oven Mugnaini Imports Inc 11 Hangar Way Watsonville CA 95076 888 887 7206 831 761 1767 Fax 831 728 5570 www mugnaini com mug...

Страница 2: ...MAGE BODILY INJURY AND EVEN DEATH WARNING DO NOT PACK THE REQUIRED 2 AIR SPACES WITH INSULATION OR OTHER MATERIAL FOR USE WITH SOLID WOOD FUEL ONLY Installation of the exhaust vent shall be in accorda...

Страница 3: ...ces to Combustible Construction 7 Installation Accessories 8 Finish Materials 8 Covering the Arch 8 4 Venting the Oven Overview 9 Exhaust Vent Requirements 9 5 Direct Venting with factory built chimne...

Страница 4: ...into account the size of your oven and entry into your building It is common to remove doors windows or open walls to gain access Seek out a qualified professional to ensure you are prepared for your...

Страница 5: ...OT SIGN THE DELIVERY BILL UNTIL THE OVEN HAS BEEN INSPECTED AND ANY DAMAGE NOTED ON THE DELIVERY BILL CALL OUR OFFICE IMMEDIATELY IF THERE ARE ANY SIGNS OF DAMAGE 888 887 7206 Opening the Crate The ov...

Страница 6: ...oven has been placed near or inside of the restaurant use the pallet jack to move the oven to the installation location It may be necessary to place steel bars or heavy wood beams across the forks of...

Страница 7: ...for the floor per steel mounting foot embedded 2 minimum Clearances to Combustible Construction The oven requires a 2 clearance on back wall and side walls to any combustible materials Do not pack th...

Страница 8: ...construction Framing for a facade wall or site built side panel should be assembled using metal studs and concrete board Non combustible finish materials may be applied to the concrete board Optional...

Страница 9: ...partments require mechanical drawings of the venting system demonstrating code compliance Exhaust Vent Requirements Installation of the exhaust vent shall be in accordance with the Standard for Ventil...

Страница 10: ...installed per chimney manufacturer s installation instructions Chimney must terminate to an approved chimney cap with spark arrestor screen mesh Chimney lengths 20 feet or longer may require an exhau...

Страница 11: ...SIMILAR LIQUIDS TO START OR FRESHEN UP A FIRE IN THIS OVEN KEEP ALL SUCH LIQUIDS WELL AWAY FROM THE OVEN WHEN IN USE NEVER USE WATER TO LOWER TEMPERATURE INSIDE THE OVEN OR TO EXTINGUISH THE FIRE USE...

Страница 12: ...s not been used for a long period it is recommended to allow one full day to slowly bring the oven up to maximum temperature SELECTING THE PROPER WOOD FOR YOUR OVEN You should use only seasoned hardwo...

Страница 13: ...amber if you intend on keeping a fire going We will use this partially closed position during the curing process to control any smoke roll out HOW TO MEASURE OVEN TEMPERATURE Mugnaini wood fired ovens...

Страница 14: ...igned front to back 3 Weber brand fire starters 1 2 3 CURING THE OVEN The goal is to increase the temperature of the oven at a rate of 50 75 F per hour by making a small fire every hour Use the chart...

Страница 15: ...gram After the fire goes out place the door through the arch into the fully closed position The door should stay in place unit the next day s fire Day 2 5 hr time commitment Record the oven temperatur...

Страница 16: ...r through the arch into the fully closed position The door should stay in place unit the next day s fire Day 4 4 hr time commitment Repeat the hourly fires starting slowly and then adding enough wood...

Страница 17: ...emperature with a thermometer do not be alarmed Most of what you read with an infrared thermometer gun is the surface temperature which will regulate down in the pauses between fires Fire placement If...

Страница 18: ...increase the oven temperature at a rate of 50 75 F per hour until the daily target temperature is reached Close door until the next day s firing Day 1 Day 2 Time Temperature Time Temperature Target 2...

Страница 19: ...ATION AND ALL OTHER OBLIGATIONS OR LIABILITIES ON THE PART OF MUGNAINI UNLESS SUCH OTHER WARRANTIES OBLIGATIONS OR LIABILITIES ARE EXPRESSLY AGREED TO IN WRITING BY MUGNAINI This warranty shall not ap...

Страница 20: ...T VIOLATION OF STATUTE OR REGULATION STRICT PRODUCTS LIABILITY CONSUMER PROTECTION STATUTES OR DECEPTIVE TRADE PRACTICES STATUTES OR 2 DAMAGES INCLUDING SETTLEMENTS JUDGMENTS AND AWARDS AND COSTS INCL...

Отзывы: