U-20808/U-20809 Non-Adjustable Vertical Indicator Posts

Installation

5

installation instructions

Post Targets must be positioned for 

use with the appropriate number 

of turns to open the post indicator 

valve. Improper positioning of the 

Targets can result in an erroneous 

indication of the open or shut 

position of the valve. The U-20808 

Indicator Post will accommodate 

positioning of the Targets to operate 

PIVs requiring 14 to 43 turns to 

open; the U-20809 Indicator Post 

will accommodate positioning the 

Targets to operate PIVs requiring 49 

to 75 turns to open.
NOTE: The Targets for the 

U-20808 Indicator Post have 

been factory set for use with a 6” 

USPVH PIV and the Targets for the 

U-20809 Indicator Post have been 

factory set for a 24” USPVH PIV. 

Consequently, Steps 6 –10 need 

not be performed when installing 

the U-20808 Post with a 6” USPVH 

PIV (or with a PIV that requires 

20

1

/

2

 turns to open) or the U-20809 

Post with a 24” USPVH PIV (or 

with a PIV that requires 75 turns 

to open).

Installing the Post

1. Completely close the PIV.
2. Place approximately 5” high 

blocks onto the stuffing box flange of 

the installed valve. Set the Indicator 

Post onto the blocks and generally 

centered over the PIV operating nut.
3. Slide out the Shipping Disk, and 

allow the Coupling to drop down 

over the PIV operating nut. Attach 

the Coupling to the operating nut 

with the Cotter Pin.
4. Remove the blocks and lower the 

Indicator Post onto the PIV stuffing 

box flange. Bolt the Bell and stuffing 

box flange together using the four 

Cap Screws and Nuts.  

NOTE: If the pipe is sloped, it may 

be necessary to shim some of the 

Cap Screws with steel washers, 

so that the Post will be plumb and 

the Stem will run true with the 

center of the Post Head. Coupling 

clearances can accommodate a 

maximum pipe slope of 5 degrees.
It is recommended that a spirit 

level be used to set the vertical 

alignment of the Indicator Post.
5. Loosen the Set Screw, and lift the 

Post Head/Upper Stem Assembly 

just high enough to insert a Phillips 

head screwdriver through Hole “A” 

in the Upper Stem. The Phillips head 

screwdriver will temporarily hold the 

Post Head above the upper Barrel.
6. Remove the Wrench, pry off the 

Cap, remove the Retaining Ring, 

and then lift the Post Head clear of 

the Upper Stem Assembly.
7. Position the Targets (see below).
8. Replace the Post Head, Washer, 

Retaining Ring, and Cap.
9. Remove the Phillips head 

screwdriver, lower the Post Head, 

and tighten the Set Screw.

positioning of targets

OPEN TARGET:

Top surface of threaded 

flange aligned with 

USPVH Valve size mark 

(10” Valve shown) OR 

set to Dimension “X” 

(see note 2).

SHUT TARGET:

Top surface of 

threaded flange 

aligned with 

CT (center top) 

mark OR bottom 

surface aligned 

with CB (center 

bottom) mark 

(see note 1).

X

OPEN TARGET:

Top surface of 

threaded flange 

aligned with USPVH 

Valve size mark (10” 

Valve shown) OR set 

to Dimension “X” 

(see note 2).

SHUT TARGET:

Top surface of 

threaded flange 

aligned with CT 

(center top) mark 

OR bottom surface 

aligned with CB 

(center bottom) 

mark (see note 1).

X

FOR

LEFT

HAND

OPENING

VALVES

FOR

RIGHT

HAND

OPENING

VALVES

NOTES:

U-20808 INDICATOR POST

1. Set shut target first.  

2. For 16” USPVH Valves (prior to 2012) set to dimension ‘x’ (3.5”)  

3. For valves manufactured by other than USPVH, set to dimension ‘x’ calculated as 

follows:                       NO. Of TURNS TO OPEN VAlVE

                                   ‘x’ in inches =  

 

  14

U-20809 INDICATOR POST

1. Set shut target first.

2. For valves manufactured by other than USPVH, set to dimension ‘x’ calculated as 

follows:                       NO. Of TURNS TO OPEN VAlVE

                                   ‘x’ in inches =  

 

  22

Содержание U-20808

Страница 1: ...training and periodic review regarding the use of this equipment is essential to prevent possible serious injury and or property damage The instructions contained herein were developed for using this...

Страница 2: ...round valves while providing an above ground visual indication as to whether the valves are open or shut in addition to a means for locking the valves in a particular position Indicator posts provide...

Страница 3: ...n be accommodated by each Order Length for the 4 24 USPVH Resilient Wedge PIVs based on the typical diameter of underground pipe For PIVs with different B dimensions the minimum and maximum trench dep...

Страница 4: ...diameter typical for underground pipe Size No D 0 2 1 8 2 14 Dimensions D Nominal Trench depths For USPVH IBBM Double Disc and Resilient Wedge Post Indicator Valves Valve size Number SIZE 0 1 2 4 1 3...

Страница 5: ...t the Post will be plumb and the Stem will run true with the center of the Post Head Coupling clearances can accommodate a maximum pipe slope of 5 degrees It is recommended that a spirit level be used...

Страница 6: ...as appropriate and note the direction in which the Trip Rod must move when the OPEN Target is returned to the Post Window Slide the Switch Assembly as far as possible onto the Nipple while maintaining...

Страница 7: ...ng 290157 20 OPEN Target U 20808 290144 U 20809 290552 21 SHUT Target U 20808 290145 U 20809 290553 22 Hex Bolt U 20808 290191 U 20809 290631 23 Hex Nut 190939 Replacement parts 1 Post Head 2 Barrel 3...

Страница 8: ...e Indicator Post should also be physically tried to be sure that the valve is in the fully open position if there are any damaged parts sign of tampering or the position of the valve is questionable N...

Отзывы: