Mueller E-Star OESE 3.5 and 5 HP HFC Condensing Unit
Installation and Operation Manual, Part No. 8828747
Effective April 13, 2020
1.2
TECHNICAL SUPPORT
This manual provides basic installation and operating information for Mueller E-Star OESE condensing units.
Please contact your local Paul Mueller Company Sales and Service Representative if you require additional
technical assistance pertaining to installation or operating procedures.
Manufacturer’s support is available by contacting the following:
Paul Mueller Company
Dairy Farm Equipment Service Department
1600 West Phelps Street
Springfield, Missouri 65802
Direct Telephone: 1-800-756-5991
Facsimile: 1-800-436-2466
Email: [email protected]
1.3
INSTALLATION INFORMATION
Electrical and refrigeration installation and service must be performed by an authorized service technician who
has the proper training to install and service refrigeration and electrical equipment.
Local, state, and/or country electrical and refrigeration regulations must be followed during installation, service,
and/or operation of this equipment.
United States Environmental Protection Agency (EPA) regulations require that any technician performing
refrigerant installation or service on a high-pressure appliance be certified as a Type II Technician in accordance
with Section 608 of the Clean Air Act. Clean Air Act regulations may change or differ, depending on locality. It is
the responsibility of the technician performing the refrigerant service and/or installation to abide by all regulatory
requirements and procedures for the locality, state, and country.
2