4.2 Engine – Putting into operation after scheduled out-of-service-
period
Preconditions
☑
Engine is stopped and starting disabled.
Putting into operation
Item
Action
Lube oil system
Check engine oil level (→ Page 110).
Coolant circuit
Check coolant level (→ Page 121).
Coolant circuit
Heat engine coolant with coolant preheating unit.
Fuel prefilter
Drain water and contaminants (→ Page 99).
Battery-charging generator
drive
Check condition of drive belt (→ Page 129).
Engine Control Unit ECU
Check plug connections (→ Page 140).
Engine Interface Module EIM Check plug connections (→ Page 142).
Engine Monitoring Unit EMU Check plug connections (→ Page 141).
54 | Operation | M015655/05E 2015-06
TIM-ID: 0000002689 - 003