5.2 Putting the engine into operation after extended out-of-service
periods (>3 months)
Preconditions
☑
Engine is stopped and starting disabled.
☑
MTU Preservation and Represervation Specifications (A001070/..) are available.
Putting the engine into operation (out-of-service period > 3 months)
Item
Measure
Engine
Depreserve (→ MTU Preservation and Represervation Specifications
A001070/..).
Universal shaft
Lubricate (→ Page 142).
Lube oil system
Check engine oil level (→ Page 116).
Fuel prefilter
Fill with fuel (→ Page 97).
Fuel prefilter, pressure
gauge
Align adjustable pointer with position of pressure indicator (→ Page 92).
Fuel system
Vent (→ Page 88).
Raw-water pump (if located
above waterline)
Prime with water (approx. 3 4 l) (→ Page 135).
Coolant circuit
If engine is out of service for more than one year, change engine coolant
(→ Page 130).
Coolant circuit
Check coolant level (→ Page 129).
Coolant circuit
Heat engine coolant with coolant preheating unit.
Engine governor ECU
Check plug-in connections (→ Page 147).
Engine control system
Switch master switch to ON;
Press illuminated pushbutton READY FOR OPERATION (→ Page 35).
LOP
Press illuminated pushbutton LAMP TEST (→ Page 35).
MW15409/04E 2015-08
| Operation | 37
TIM-ID: 0000002215 - 004
Содержание 12V2000M91
Страница 1: ...Operating Instructions Diesel Engine 12V2000M91 16V2000M91 MW15409 04E...
Страница 23: ...MW15409 04E 2015 08 General Information 23 TIM ID 0000002178 006...
Страница 24: ...Lube oil system covers 24 General Information MW15409 04E 2015 08 TIM ID 0000002178 006...
Страница 25: ...MW15409 04E 2015 08 General Information 25 TIM ID 0000002178 006...
Страница 169: ...W Waterjet Flushing From LOP option 45 MW15409 04E 2015 08 Appendix B 169 DCL ID 0000039398 002...