15
CABLES
Disconnect the cable from the line. Also, disconnect
opposite end to avoid errors due to leakage from
other equipment. Check each conductor to ground
and
/or
lead
sheath
by
connecting
one
megohmmeter lead to a ground and /or lead sheath
and the other megohmmeter lead to each of the
conductors in turn. Check insulation resistance
between conductors by connecting megohmmeter
leads to conductors in pairs.