![MRS 1.033 Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/mrs/1-033/1-033_operating-instructions-manual_1845977014.webp)
6 Assembly
11
VST_GA1_1.4 | Version 1.4 | 02/2022
6
Assembly
Assembly work may only be performed by qualified staff (see Chapter 2.2). The gateway may
only be operated after having installed in a fixed location
.
INFORMATION
If the gateway falls down, it may no longer be used and must be returned to MRS to be
checked.
6.1
Mounting location
The mounting location must be selected as such that the gateway is subjected to as low a
mechanical and thermal load as possible. The gateway may not be exposed to chemicals.
INFORMATION
Please observe the permissible environmental conditions in the data sheet
.
6.2
Mounting position
Mount the gateway in such a way that the connectors point downwards. This ensures that
possible condensation water can flow off. Individual seals of the cables/wires ensure that no
water can enter the gateway
.
6.3
Fastening
Gateway with fastening straps
The gateway must be screwed to the complete system at both side fastening straps. The
selection of the connecting elements, securing the connections and the torque are determined
by the manufacturer of the complete system. Please observe the specified hole distance in the
data sheet.