MRC SPC-60 Скачать руководство пользователя страница 6

4

 

4.

Device connection

4.1.

 

Installation location

 

The installation location should be selected on a flat,  stable, spacious  and well-ventilated surface. 
Otherwise,  the  spinning  coating  effect  may  be  affected.  If  you  need  to  deal  with  glue  containing 
volatile  or  toxic  solvents,  be  sure  to  place  the  equipment  in  a  well-ventilated  fume  hood.  The 
installation location of the equipment should be away from direct sunlight or cold/heat sources and 
moisture. Do not install the device on the edge of the workbench to prevent the device from slipping 
off  due  to  vibration  during  operation.  20cm  should  be  delineated  around  the  equipment  as  a 
dangerous work area. 

4.2.

 

Vacuum unit 

The vacuum gas circuit adopts the 

φ

8mm quick screw joint, which needs to be used with the outer 

diameter of 8mm hose. The installation of quick screw joint is shown in the following figure: 

1) Remove the nut and pass the hose through the nut;

2) Put  the  hose  into  the  joint  in  front  of  the  thread,  paying
attention to the need to completely cover the joint with the hose;

3) Tighten  the  thread,  the  nut  can  compress  the  hose  after
tightening, and play a sealing role.

4.3.

 

Circuit installation 

First, connect the power cord of the diaphragm pump to the vacuum pump control line interface on 
the back of the spin coater. The male and female ports of the interface have white dots to indicate the 
position of the gap. During installation, the white dots should be aligned first, and then the male port 
should be inserted tightly, and the outer nut should be tightened to connect the control line tightly. 
Finally, insert the power cord into the power port on the back of the spin coater, and then connect the 
plug to the socket (AC220V 50Hz) to ensure that the socket is reliably grounded. 

Содержание SPC-60

Страница 1: ...6 8inch spin coaters SPC 60 80 Operating instruction PLEASE READ THIS MANUAL CAREFULLY BEFORE OPERATION Hagavish st Israel 58817 Tel 972 3 5595252 Fax 972 3 5594529 mrc mrclab com 3 MRC 8 22 ...

Страница 2: ...onnection 4 4 1 Installation location 4 4 2 Vacuum unit 4 4 3 Circuit installation 4 4 4 Loading substrate 5 4 5 Substrate alignment 5 5 Experiment operation 6 5 1 Whole process 6 5 2 Operation interface 6 6 Matters needing attention 8 6 1 Equipment cleaning 8 6 2 Tray replacement 8 ...

Страница 3: ...ials research The working chamber of the spin coater is made of PMMA which has the advantages of beautiful light and easy to observe Product features 1 It can be used for coating organic compounds with uniform glue for film preparation 2 It can store the process parameters of different substrates Each coating process can be set with different rotation speed 3 The working chamber is made of plexigl...

Страница 4: ...tion time resolution 1 S Maximum acceleration 8 000RPM S Size 290mm W x360mm D x370mm H Weight 20kg Power input 200 230V single phase 600W Vacuum input requirements 0 06 0 09Mpa vacuum flow minimum 15L min or more Vacuum interface φ6 8mm quick screw interface Working gas Non corrosive gases such as nitrogen argon oxygen etc ...

Страница 5: ...ver 2 Loading tray 3 Chamber bottom cover 4 Touch screen 5 Power switch 6 USB interface 7 Vacuum interface 8 Vacuum pump communication port 9 Power cord The structure of the tray is shown in the figure a Central exhaust b O ring c Vacuum adsorption tank d Loading tray ...

Страница 6: ...ter of 8mm hose The installation of quick screw joint is shown in the following figure 1 Remove the nut and pass the hose through the nut 2 Put the hose into the joint in front of the thread paying attention to the need to completely cover the joint with the hose 3 Tighten the thread the nut can compress the hose after tightening and play a sealing role 4 3 Circuit installation First connect the p...

Страница 7: ...f the equipment thereby blocking or corroding the internal pipeline of the equipment 4 5 Substrate alignment Align the center of the substrate with the center of the tray You can turn on the vacuum pump to adsorb the substrate on the tray plate try to manually flip the tray plate and observe whether the sample rotates eccentrically If there is eccentricity it should be adjusted again until the sub...

Страница 8: ...vacuum adsorption is firm during operation and observe whether the sample can be accurately aligned 5 After the trial run wait for the running to stop and then set the coating program as required 6 Drop the experimental liquid into the center of the sample and close the lid 7 Click Start on the touch screen and wait until the coating is finished 8 After the loading tray completely stops rotating t...

Страница 9: ...stop of the equipment and the setting can enter the setting interface The pump switch can control the start and stop of the vacuum pump Setting interface The setting interface is shown in the figure which can store A E five spin coating formulations Each formula can be set with five stages of operation The rotation speed acceleration and duration of each section can be directly set by clicking the...

Страница 10: ...nt damage to the contact surface between the substrate and the tray plate Notice It is strictly forbidden to use spray cleaning solvent or directly use solvent to clean the tray plate still installed on the shaft which may cause damage to the vacuum pump or the spin coater 6 2 Tray replacement Various sizes of trays are designed to provide a flat hard surface suitable for processing substrates of ...

Отзывы: