6 Commissioning
Maschinenfabrik Reinhausen GmbH 2020
216
7545652/00 EN
VACUTAP
®
VR-Ex
In the event of a short-term immobilization time (maximum of 4 weeks) with-
out an oil conservator, it is also sufficient to remove approximately 5 liters of
insulating fluid from the on-load tap-changer oil compartment.
6.2.3 Transport with empty transformer tank
NOTICE
Damage to the on-load tap-changer!
The on-load tap-changer may be subject to oscillating movements during
transformer transportation if the transformer is transported without insulating
fluid and the on-load tap-changer oil compartment is transported with insu-
lating fluid. These oscillating movements can lead to damage to the on-load
tap-changer.
► Completely empty the oil compartment if the transformer is to be trans-
ported without insulating fluid.
► Preserve the oil compartment in the same way as the transformer (for ex-
ample by filling with N2).
6.2.3.1 Emptying oil compartment via pipe connection S
1. De-energize all auxiliary circuits (e.g tap-change supervisory device, pres-
sure relief device, pressure monitoring device).
2. With the stop-cock (slide valve) between oil conservator and oil compart-
ment open, open air-vent valve E1 on the on-load tap-changer head.
3. Discharge the gas from under the on-load tap-changer cover. Ensure suf-
ficient fresh air (e.g. in transformer cells and work tents) when doing so.
4. Once the gas has been discharged and the insulating fluid is flowing out
of the air-vent valve, close the air-vent valve and close the stop-cock be-
tween the oil conservator and oil compartment.
5. Open air-vent valve again and drain off approximately 5–10 liters of insu-
lating fluid via the pipe connection S until the area under the on-load tap-
changer head cover is free of insulating fluid.
6. Loosen 24 screws M10 / wrench size 17 with locking elements on the on-
load tap-changer head cover.
7. Remove on-load tap-changer head cover.
8. Extract insulating fluid via pipe connection S.
9. Open stop-cock between oil conservator and oil compartment.
ð
Insulating fluid flows out of the oil conservator into the oil compartment.
10. Extract insulating fluid via pipe connection S.
11. Place on-load tap-changer head cover on the on-load tap-changer head.
12. Screw down on-load tap-changer head cover using 24 screws M10 /
wrench size 17 and locking elements (tightening torque 34 Nm).
Содержание VACUTAP VR-Ex
Страница 73: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 73 7545652 00 EN VACUTAP VR Ex Figure 70 VACUTAP VRS ...
Страница 74: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 74 7545652 00 EN VACUTAP VR Ex Figure 71 VACUTAP VRM VRH VRX ...
Страница 75: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 75 7545652 00 EN VACUTAP VR Ex Figure 72 VACUTAP VRM VRH VRX ...
Страница 76: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 76 7545652 00 EN VACUTAP VR Ex Figure 73 VACUTAP VRL VRH ...
Страница 77: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 77 7545652 00 EN VACUTAP VR Ex Figure 74 VACUTAP VRL VRH ...
Страница 234: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 234 7545652 00 EN VACUTAP VR Ex 9 Drawings 9 1 Dimensional drawings ...
Страница 237: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 237 7545652 00 EN VACUTAP VR Ex 9 2 On load tap changer head ...
Страница 238: ......
Страница 241: ......
Страница 242: ......
Страница 243: ......
Страница 244: ......
Страница 245: ......
Страница 246: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 246 7545652 00 EN VACUTAP VR Ex 9 3 Adjustment plans ...
Страница 254: ......
Страница 255: ......