
6 Electrical connection
64
BA6820378-03 EN
To connect the cables for integration into a 4-conductor system, proceed as
follows:
1. Insert the wire for Rx+ into screw terminal "1 Rx+" and tighten.
2. Insert the wire for Rx- into screw terminal "1 Rx-" and tighten.
3. Insert the wire for Tx- into screw terminal "2 Tx-" and tighten.
4. Insert the wire for Tx+ into screw terminal "2 Tx+" and tighten.
5. Insert the wire for the ground potential into screw terminal "Comm" and
tighten.
6. Twist the shielding, insert it into the "Shield" terminal and tighten.
Figure 43: Connecting the full-duplex cable
Содержание MESSKO MTRAB
Страница 1: ...Dehydrating breather MESSKO MTRAB Operating instructions BA6820378 03 EN Version 2 5 ...
Страница 19: ...3 Product description 19 BA6820378 03 EN 3 2 Design versions Figure 1 Design ...
Страница 82: ...8 Operation 82 BA6820378 03 EN Figure 62 Ball valve 1 Switch 2 Ball valve 3 Display 4 Ball valve control cable ...
Страница 84: ...9 Error messages and troubleshooting 84 BA6820378 03 EN Figure 63 LEDs 1 Green LED 2 Yellow LED 3 Red LED ...
Страница 102: ...11 Disposal 102 BA6820378 03 EN Observe the national disposal regulations in the country of use ...
Страница 114: ......
Страница 121: ......
Страница 122: ......
Страница 123: ......