5
operating Instructions and owner’s Manual
Enerco Group, Inc. | Convection Construction Heater
CAUTION: NEVER IgNITE ANd / OR RUN THIS HEATER UNlESS THE SHEllS
ARE FUllY EXTENdEd ANd lOCKEd INTO pOSITION.
STEp 2: LIfT OuTEr SHELL STrAIGHT up. CArE MuST bE TAKEN
To PRoTECT HAnDS DURInG LIFT.
STEP 3: LIFT oUTER SHELL UnTIL ALL THREE CLIPS
EnGAGE SLoTS In LoWER SHELL. WHEn THIS HAPPEnS,
THE SCREW HoLES WILL LInE UP.
STEP 4: LoCK THE CLIP InTo PLACE WITH 3 SCREWS AS
SHoWn. THE HEATER MUST noT BE oPERATED UnLESS THE
oUTER SHELL IS PRoPERLY EXTEnDED AnD FULLY LoCKED InTo
PLACE.
CAUTION: NEVER IgNITE ANd / OR RUN THIS HEATER UNlESS THE SHEllS
ARE FUllY EXTENdEd ANd lOCKEd INTO pOSITION.
STEP 1: HEATER AS RECEIVED oUT oF BoX. BEFoRE
LIFTInG oUTER SHELL PRoTECT HAnDS. nEVER
GRASP BARE METAL WITHoUT HAnD PRoTECTIon.
Make sure clip goes into
slot in lower shell.
3 Places
Lock shells together and
clips in place with screws
in each clip. 3 Screws
Total.