background image

이오나이저 필터

분진 필터

Dust Filter

집진셀

Dust Collector

Ionizer Filter

Cleaning of Smoke Eliminator

1. 제연기의 문을 열고 1번 필터를 빼낸 뒤 진공소제기를 이용하여 커피깍지나 먼지를 깨끗이 제거합니다.  

2. 1번 필터는 매 20kg에 도달하면 새 필터로 갈아끼운다.

3. 2번 이온아이저와 3번 집진셀은 분진이 많이 차면 빼내어 세제와 물로 청소하면 분진이 제거된다.
    분진이 제거된 것은 말린 후 다시 집어 넣으면 새것과 같은 기능을 한다.

4. 4번 탄소섬유필터는 가끔 진공청소기로 청소를 해주며 매 6개월에 한번 새것으로 교체해주어야 한다.

1. Open the side door and take out filter 1.  Use a vacuum cleaner to remove chaff and dust from it.  
2. Filter 1 needs to be exchanged every 20kg of roasting.
3. When a good amount of dust is collected on the Ionizer (2) and the Dust Collector (3),
     take them out and cleanse it with detergent and water. Allow these filters to dry
     and replace it back into the smoke eliminator and they will regain full functionality.
4. The Carbon Filter needs to be cleaned with a vacuum cleaner occasionally
    and needs to be exchanged every 6 months.  

제연기의 청소요령 

13

Korean

English

카본섬유필터

Carbon Filter

Содержание ROASTBOY

Страница 1: ...User Manual Warranty...

Страница 2: ...Preheating Stage Quantity Roasting Degree Selection Green Bean Insertion Roasting Stage Changing the Roasting Temperature Roasting Cancellation Ejection Cooling Stage Repeat Roasting Turing Off the M...

Страница 3: ...GUI GUI Touch Screen Cooling Bin Exhaust Dumping Door Green Bean Loader Front View Filter Check and Replacement Door Chaff Bin Side View 2 Insertion Door...

Страница 4: ...1 LCD 3 LCD 210...

Страница 5: ...machine to the on position The company logo will appear on the LCD screen The First Stage 3 LCD Touch Screen Cancel Roasting Time Drum Temperature Bean Temperature Roasting Profile Current Status Ind...

Страница 6: ...4 2...

Страница 7: ...he Chaff Bin and the preheating stage will begin The voice instruction will inform you that it is now in the preheating stage When you press the start button a pop up of Empty the Chaff Drawer will ap...

Страница 8: ...3 200 C 210 C 250g 500g 1kg 4 5...

Страница 9: ...quantity of green beans will be given as it will also appear on the screen Select the green bean quantity of either 250g 500g or 1kg 4 After selecting the quantity of beans the voice instruction will...

Страница 10: ...6 2 3...

Страница 11: ...imes Cooling Coffee Batch This step is extremely important A coffee bean from the previously roasted batch can get caught on the dumping door and cause the green beans to spill on the cooling coffee b...

Страница 12: ...7 5 6...

Страница 13: ...nsertion Cover for the beans to enter the roasting drum The roasting stage will begin when the cover is shut The final roasting temperature depending on the roasting degree will appear on the superior...

Страница 14: ...OK 8...

Страница 15: ...ng the yes button OK Changing the Roasting Temperature During Roasting Roasting Cancellation If the final roasting temperature needs to be adjusted press the temperature and the number board will appe...

Страница 16: ...3 3 9...

Страница 17: ...Beep The alarm will sound 3 different times When the alarm rings head to the machine and check up on how the roasting is going If the batch reached the roasting temperature already but has not automa...

Страница 18: ...7 15 8 2 4 10...

Страница 19: ...The ejection time of the coffee is approximately 15 seconds Stirring the coffee when it is dumped into the cooling bin will maximize the cooling effect 8 The cooling stage starts when the coffee is d...

Страница 20: ...10 OFF 3 LED 9 12 13 3 11...

Страница 21: ...is selected the heater will immediately be turned off and the roasting drum will cool down 9 When the dumping stage is complete the screen will display would you like to roast another batch 10 To tur...

Страница 22: ...you must clean the hood filter Open the filter door and take out the filter cartilage Remove the filters from the cartilage The metal filter only needs to be vacuum cleaned The fabric filter must be...

Страница 23: ...ed every 20kg of roasting 3 When a good amount of dust is collected on the Ionizer 2 and the Dust Collector 3 take them out and cleanse it with detergent and water Allow these filters to dry and repla...

Страница 24: ...Roastboy 1kg 10kg 300kg 10kg 1 5kg 2 5kg 3 4 LCD 14...

Страница 25: ...ting stage not moving on to the roasting stage Therefore the coffee beans will not automatically be dumped into the cooling bin even after it has reached its final roasting temperature In this case ma...

Страница 26: ...A S 1 2 1 ROASTBOY 201 201 1 3 1 1 905 TEL 02 540 5360 FAX 02 517 5803 www mrcoffee co kr...

Страница 27: ...the warranty period has terminated When the machine is defected by the customer s fault waterlogged impacted improper assembling by the customer etc Defect due to repairing the machine at a location...

Страница 28: ...ity Roasting Time Maximum Production 1 1 611 x 692 x 815 mm 3 2Kw 95Kg 1kg 500g 250g 9 15 min 4kg in 1 hour 1 1 905 TEL 02 540 5360 FAX 02 517 5803 905 The Rubens Valley 1 Gasan Digital 1 ro Geumchun...

Отзывы: