ATD 50 Actuator
®
Operating Instructions
Page 11
3811 N. Holton Street • Milwaukee, WI • 53212 •USA • Phone • 414-906-4000 • Fax 414-906-4100 • www.MPCovers.com
5.2 Start-up
•
Check the main power voltage selection switch for proper supply voltage (230V /
115V)
•
Check the control connections and verify they are correctly installed
Beware of Electrical Voltages!
•
Switch on the main power supply to the drive.
•
Start the calibration run (see section below).
•
Check and test all functions to be used.
•
If required, re-adjust door-specific parameters (opening and closing speeds,
braking distance, etc.) using the SERsoft programming software.
•
Test the complete system.
6 Check List for Functional Tests
During the functional tests the door travel path must be free of obstructions. The only
limits to door travel should be the two end-stops. Test the unit according to the
following steps:
TEST 1:
POWER-UP
ACTION:
Energize the main power to the ATD 50 Actuator
®
EXPECTED BEHAVIOR:
No door movement.
Green LED on the Control Board illuminates.
Door is freely moveable.
No errors displayed on LED’ at terminals D5 - D9 (if
installed).
No errors displayed in the SERsoft Diagnostic Display.
TEST 2:
CALIBRATION RUN
ACTION:
Apply momentary or maintained contact between OPEN
input (A2) and Ground (A1).
EXPECTED BEHAVIOR:
Door moves slowly to open position and pushes against
end-stop.
Open position is now set in the microprocessor.
ACTION:
Apply momentary or maintained contact of CLOSE input
(A7) and Ground (A1).
EXPECTED BEHAVIOR:
Door moves slowly to closed position and pushes
against end-stop.
Closed position is now set in the microprocessor.