2
2
Chapter 2
Getting Started
In this chapter, we give instructions on installing NPort IA5150/5250 device servers. Software
installation is covered in subsequent chapters.
The following topics are covered in this chapter:
Panel Layout
Connecting the Hardware
¾
Wiring Requirements
¾
Connecting the Power
¾
Grounding NPort IA5150/5250 Series
¾
Connecting to the Network
¾
Connecting to a Serial Device
¾
LED Indicators