8
Installation manual Infix ProLine
3. Important installation information
3.1 Preparation work
Mounting Systems recommends that you inform yourself
about the local conditions prior to ordering Infix ProLine.
In particular, be familiar with:
• the roof construction,
• the roof batten thickness,
• the roof batten quality and
• the roof batten spacing.
3.2 Installation aids and required tools
The following tools will be needed for the installation
of Infix ProLine:
• Roof ladder
• Folding rule
• Chalk line to align the adapters
• Aluminium level (to check the flatness of the battens
and the module field)
• Cut-off grinder with a stone disc (to fit the tiles)
• Metal cutters (for cutting the metal sheets, sealing
strip, etc.)
• Roofing tinsmith tools, i.e. crimping or clinching pliers
(for possible work on the flashings)
• Rubber hammer
• 6 mm Allen key
• Cordless drill with an 8 mm hex headbit (for adapter
screws) and torx bit (for calottes and roofing screws)
3.3 Additionally required material
Depending on the system plan, the following additional
materials may be necessary:
• Double-sided adhesive tape
• Roof battens
• Appropriate wood screws for fixing roof battens
• Appropriate material for sealing and additional fixing
of the surrounding tiles, as needed.
Risk of fatal injury
from damage to roof
Excessive loads can severely
damage the roof.
• Before mounting and installation,
please make sure that the building
and especially the roof cladding
meets the increased structural
requirements for the PV system
and the mounting operation.
Risk of fatal injury
from falling objects
Parts falling from the roof can result
in serious injuries or death.
• Before commencing with the
installation, please ensure that
the material used meets the
structural requirements of the site.
DANGER
DANGER
Содержание Infix ProLine
Страница 1: ...Infix ProLine Installation manual ...