15
Installation manual Infix ProLine
Laying the corrugated metal sheets
5.2-3 Corrugated metal sheets
1. Corrugated metal sheets
2. Roofing screw 4.5 x 45 mm with calotte
3. Landscape adapter
Mounting steps:
• Place the lower edge of the corrugated sheet onto
the sealing strip with adequate overlapping:
100 mm for the foam profile filler and 150 mm for
the comb profile filler (see „Installing the lower
profile filler“).
• Position the corrugated sheets so that the sides
end with corrugation pointing downward to the
roof truss.
5.2-4 Corrugated metal sheet end
Leaky construction
If the corrugated metal sheets do not
sufficiently overlap, the roof may
become subject to leaks.
• Sheets must overlap above each
other by at least 200 mm
vertically and by at least
80 mm = 2 high points of the
corrugation horizontally.
• Lay the corrugated sheets in
sequence starting from the
bottom and working upwards,
and plan the side overlap in
accordance with the main wind
directio
n.
CAUTION
1
2
3
Содержание Infix ProLine
Страница 1: ...Infix ProLine Installation manual ...