Mo
odel EA
4.4. Ins
Positioner
front of ac
(1) Conne
stem.
IMPORTAN
(2) Brack
(3) Brack
(4) Instrum
(5) After
regula
(6) Conne
(7) Return
IMPORTAN
A10S
stallatio
r should be in
ctuator.
ector arm sh
NT
At th
Besid
actua
et should be
et should be
mental air pi
turning Aut
ator should b
ector pin sho
n the Auto/M
Installa
NT
①
Con
sh
is
an
lev
fee
str
②
Pos
sho
fixe
on to lin
nstalled by u
ould be attac
his time, clam
des, fixing cla
ator.
e installed to
e installed to
ping should
o/Manual sw
be adjusted to
ould be fixed
Manual switch
ation diagram
nnector pin a
hould be adju
placed horiz
nd that conne
ver at the
edback lever
roke.
sition of sprin
ould be adjus
ed at middle o
ear mot
sing threade
ched to stem
mped positio
amp should b
positioner.
actuator.
be installed.
witch to M(
o gain 50 %
to connecto
h to A (auto).
m to Model
and a part of
usted so that
zontal at 50
ctor pin is fix
place wher
r scale acco
ng to fix conn
sted so that c
of the spring.
- 14 -
tion act
ed holes at b
m clamp and
on should be
be carried ou
(manual), ai
valve travel.
r arm.
3800 actuat
connector a
feedback lev
% valve trav
xed to feedba
re reading
ords with val
nector pin
connector pin
.
tuator
ackside of po
these assem
e approximat
ut so that con
r
tor
rm
ver
vel
ack
of
lve
n is
To
Con
ositioner and
mbled parts s
ely 5 to 10 m
nnector arm i
p stem
nnector arm
d threaded h
should be cla
mm upper fr
is parallel to
No.
Pa
1
Bracke
2
Conne
3
Conne
4
Conne
5
Bolt
6
Spring
7
Bolt
8
Spring
9
Bolt
10
Spring
11
Nut
12
Conne
13
Stem c
14
Bolt
15
Spring
oles at the
amped to top
rom locknut.
front face of
art Name
et
ector arm B
ector arm A
ector guide
g washer
g washer
g washer
ector pin
clamp
g washer
Stem clamp
f
Qty.
1
1
1
1
2
2
4
4
3
3
1
1
1set
2
2
p
Содержание EA10S
Страница 67: ...Mo odel EA A10S 63...