9 Recovery Mode
149
On confirmation the following page will be displayed (Figure 90).
Figure 90 - Zeroise Security Parameters Successful Page
This option can be used to reboot the unit. The user will now be presented with a pop up box
asking them to confirm the action (Figure 91).
Figure 91 – Recovery - Reboot Confirmation Pop Up
The unit will now reboot. The unit should now start up in normal operational mode. Should the
unit fail to start up the user should refer to Section 10 “Fault Finding”.
Содержание PTP 54500
Страница 1: ...PTP 500 Series User Guide MOTOROLA POINT TO POINT WIRELESS SOLUTIONS ...
Страница 2: ......
Страница 132: ...8 Web Page Reference 130 Figure 65 Spectrum Management Slave Screen With Operational Restrictions ...
Страница 190: ...14 Data Rate Calculations 188 Figure 111 QPSK 0 50 Single Payload Figure 112 QPSK 0 75 Single Payload ...
Страница 191: ...14 Data Rate Calculations 189 Figure 113 16 QAM 0 50 Single Payload Figure 114 16 QAM 0 75 Single Payload ...
Страница 192: ...14 Data Rate Calculations 190 Figure 115 64 QAM 0 67 Single Payload Figure 116 64 QAM 0 83 Single Payload ...
Страница 193: ...14 Data Rate Calculations 191 Figure 117 QPSK 0 50 Dual Payload Figure 118 QPSK 0 75 Dual Payload ...
Страница 194: ...14 Data Rate Calculations 192 Figure 119 16 QAM 0 50 Dual Payload Figure 120 16 QAM 0 75 Dual Payload ...
Страница 195: ...14 Data Rate Calculations 193 Figure 121 64 QAM 0 67 Dual Payload Figure 122 64 QAM 0 83 Dual Payload ...
Страница 205: ...16 Legal and Regulatory Notices 203 16 4 Exposure See Section 2 Avoiding Hazards ...