Chapter 4 Finishing the Installation
Perform the following if it has not been previously done:
1. Turn the radio
ON
at the control head and verify proper operation of all controls and
indicators. Radio operation in some installations require turning on the ignition. Perform a
complete operational check of the radio.
2. Dress the control and power cables out of the way to prevent damage (pull any excess cable
into the trunk area) securing with clamps and tie wraps where necessary.
Содержание PM1200
Страница 1: ......
Страница 2: ......
Страница 8: ...vi List of Figures October 2007 6880309U11 Notes ...
Страница 9: ...List of Tables vii 6880309U11 October 2007 List of Tables Table 2 1 Connector Pin Functions 2 3 ...
Страница 10: ...viii List of Figures October 2007 6880309U11 Notes ...
Страница 12: ...October 2007 6880309U11 Notes x ...
Страница 16: ...October 2007 6880309U11 xiv CommercialWarranty Notes ...
Страница 34: ...October 2007 6880309U11 2 16 Standard Configurations Notes ...
Страница 42: ...October 2007 6880309U11 4 2 Finishing the Installation Notes ...
Страница 53: ......
Страница 54: ......