
xvi
Summary of Changes
The following changes were made for the 2nd revision of this manual.
Overview of Contents
The following paragraphs briefly describe the contents of each chapter.
Chapter 1, Preparation and Installation
, provides a description of the
MVME2100 and its main integrated PMC and PC•MIP boards. The
remainder of the chapter includes an explanation of the installation
procedure, including preparation and jumper setting information.
Chapter 2, Operating Instructions
, provides a description of the
operational functions of the MVME2100 including tips on applying
power, a description of the switch settings, the status indicators, standard
jumper settings, I/O expansion and PMCspan slots.
Chapter 3, Functional Description
, provides an explanation of the
functional components on the MVME2100. The chapter includes a listing
of the MVME2100 features and a block diagram. The remainder of the
chapter includes specific descriptions of each functional element on the
board and a description of its functional characteristics.
, describes the PPCBug debugger and
diagnostics firmware including a listing of the initialization sequence, a
brief explanation of how to use PPCBug and a description of the standard
list of debugger and diagnostic commands.
Date
Doc. Rev
Changes
07/2001
V2100A/IH2
A correction was made on page
to change the
explanation of the jumper settings for Flash Bank A
and B. Flash Bank B (0) is the factory setting.
Appendix B, Specifications, was also updated.
Other corrections were made throughout the
manual. This section titled "About this Manual"
was also added.