Issue 3.1, July 2006
Page 128 of 162
Figure 77: Surge Arrestor ALPU-ORT Connection Illustration
Note:
Cable screens have been sleeved.
The 30/60 Mbps Backhaul ODU grounding point can be found on the bottom of the unit. The
30/60 Mbps Backhaul is supplied with an appropriate grounding lug for attachment to the ODU.
Содержание MOTOwi4 Canopy 30
Страница 1: ...Canopy 30 60 Mbps Backhaul User Guide BH30 60 UG en Issue 3 1 July 2006 ...
Страница 73: ...Issue 3 1 July 2006 Page 73 of 162 Figure 41 Fixed Frequency Operation Page 2 ...
Страница 74: ...Issue 3 1 July 2006 Page 74 of 162 Figure 42 Installation Wizard Confirm Configuration Normal ...
Страница 75: ...Issue 3 1 July 2006 Page 75 of 162 Figure 43 Installation Wizard Confirm Configuration Fixed Frequency ...
Страница 92: ...Issue 3 1 July 2006 Page 92 of 162 Figure 58 Spectrum Management Fixed Frequency Screen Master ...
Страница 104: ...Issue 3 1 July 2006 Page 104 of 162 Figure 69 System Reboot ...
Страница 124: ...Issue 3 1 July 2006 Page 124 of 162 Figure 75 Upper Grounding Configuration ...
Страница 137: ...Issue 3 1 July 2006 Page 137 of 162 Figure 83 Connectorized 30 60 Mbps Backhaul Confirm Installation Page ...