119
Adding New Events
5
After you have assigned a start time to the event, you can specify the
duration of the event. The default duration is one hour. To assign a
different duration:
With the Duration field highlighted, press
B
under CHANGE.
From the Duration screen, press
R
to scroll to the desired duration. If
you select None, the event will have a duration of zero minutes.
Press
B
under SELECT.
The Event Form screen returns with the StartDate field highlighted.
6
The default date assigned to an event is the day that was highlighted
when you accessed the Event Form screen to add the event. To assign a
different date:
With the StartDate field highlighted, press
B
under CHANGE.
From the StartDate screen, enter the date of the event:
Type in the date, or press
S
to scroll through the months, days, and
years. Press
T
or press
B
under
G
to move through the fields.
Press
A
under DONE.
The Event Form screen returns with the Repeat field highlighted.
Содержание I80s
Страница 2: ...nextel com ...
Страница 8: ...vi nextel com ...
Страница 46: ...38 nextel com ...
Страница 101: ...93 Nextel Voice Mail Tree Nextel Voice Mail Tree ...
Страница 102: ...94 nextel com ...
Страница 108: ...100 nextel com ...
Страница 132: ...124 nextel com ...
Страница 144: ...136 nextel com ...
Страница 174: ...166 nextel com ...
Страница 212: ...204 nextel com ...
Страница 220: ...212 nextel com ...