background image

 

 

 

 

 

 

Pull the end of the rope by hand and lock in the grip. The tension must be identical on both sides, to verify that the pulley is well positioned 

in the center of the front profile. Make sure the rope is properly guided on all the pulleys in the system. Open the awning all the way down. 

Place the awning with 50 cm of opening, to make more tension of the rope. Perform an opening and closing maneuver. The fabric must be 

taut.

8

Fabric tension

9

Limit switch regulation

Course stoppers are factory preset. To manually adjust see next page.

End of assembly

B

C

B

D

Eb

C

D

Rt

Po2

Face

Cover

Front profile

2 part pre-assembly

Winding direction

to

P1

NOT

OK

Attention, 

from

 B 

to

 

C, 

make sure that 

the rope does not 

wrap itself, as it may 

break after a lot of 

use.

from

to

Then, slide the rope through the profile, pass 

the rope through the pulley and slide it again 

along the profile to the load bar. 

Attention: the cover will be placed when the 

rope is tensioned.

All respecting the winding direction, make 3 courses 

of the wire around the winding tube pulley and fix. 

Pass the thread under the pulley 

P1

 by sliding it 

through the guide and finding the bottom cover at 

C

.

from

to

B

D

  

10 Finalization

After the adjustments have been made, replace the cassette cover and the front profile cover by tightening the two screws.

  

P1

Eb

Po1

Ac

Po2

P2

P2

Direction of travel 

the rope takes when 

it is assembled 

(overview)

Note:

1)

 Pulley 

Po1

 must be placed in 

the middle of the front profile.

2) Po1

 

→ Ac 

=

 

20cm

3)

 The rope passes first under and 

then over 

Po1.

Pin up

Ac

Po2

20c

m

1

2

3

D

from

Po1

to

Содержание VARANDA

Страница 1: ...cessary to apply shims that allow the awning fixing plates to be correctly installed Important PRE INSTALLATION INFORMATION Installation manual VARANDA AWNING Varanda Inside the package Ce Bc Rt Eb Po...

Страница 2: ...I profile Preparation of the cassete and front profile Bc B A C Disassemble Assemble Slide front profile on fabric Assemble again Po1 D 3 2 max 100cm Eq Si Sp Screw SI to Sp that is inserted into CI r...

Страница 3: ...e position shown above to assemble the cassette together Support tube example Adapt the fixing of the awning to the type of balcony you have C I Varanda without support tubes min 30cm Si St St s dista...

Страница 4: ...Other supports 5 Varanda without support tubes Simple guide Dual Guide Varanda with support tubes Simple guide Dual Guide...

Страница 5: ...cement of the maneuver rope B C Eb Attention for the awning to function correctly pay close attention to the following instructions Operation to be carried out on the 2 reinforcements Face Front profi...

Страница 6: ...hat the rope does not wrap itself as it may break after a lot of use from to Then slide the rope through the profile pass the rope through the pulley and slide it again along the profile to the load b...

Страница 7: ...the upper protrusion When turning to the right the awning opens more When turning to the left the awning closes more Note When regulating several times the motor may need to rest Limit switch closing...

Страница 8: ...ey The tension of one rope is higher than the other pulley Po1 off center Incorrect tension in the base Fabric deformation Natural effect Rupture of the rope Faulty electrical maneuver The motor goes...

Страница 9: ...TVAR18 TVAR20 21 Cassette Guide Cassette lateral covers Tube Support 78mm Tube Bushing 78mm Cassette pulley Tube 78mm Cassette Superior Profiles Cassette Bottom Profile Tubular motor Motor support Gu...

Отзывы: