Pull the end of the rope by hand and lock in the grip. The tension must be identical on both sides, to verify that the pulley is well positioned
in the center of the front profile. Make sure the rope is properly guided on all the pulleys in the system. Open the awning all the way down.
Place the awning with 50 cm of opening, to make more tension of the rope. Perform an opening and closing maneuver. The fabric must be
taut.
8
Fabric tension
9
Limit switch regulation
Course stoppers are factory preset. To manually adjust see next page.
End of assembly
B
C
B
D
Eb
C
D
Rt
Po2
Face
Cover
Front profile
2 part pre-assembly
Winding direction
to
P1
NOT
OK
Attention,
from
B
to
C,
make sure that
the rope does not
wrap itself, as it may
break after a lot of
use.
from
to
Then, slide the rope through the profile, pass
the rope through the pulley and slide it again
along the profile to the load bar.
Attention: the cover will be placed when the
rope is tensioned.
All respecting the winding direction, make 3 courses
of the wire around the winding tube pulley and fix.
Pass the thread under the pulley
P1
by sliding it
through the guide and finding the bottom cover at
C
.
from
to
B
D
10 Finalization
After the adjustments have been made, replace the cassette cover and the front profile cover by tightening the two screws.
P1
Eb
Po1
Ac
Po2
P2
P2
Direction of travel
the rope takes when
it is assembled
(overview)
Note:
1)
Pulley
Po1
must be placed in
the middle of the front profile.
2) Po1
→ Ac
=
20cm
3)
The rope passes first under and
then over
Po1.
Pin up
Ac
Po2
20c
m
1
2
3
D
from
Po1
to