X250S Load Bank
9
2. Place desired step switches in the ON position to apply load step
by step.
v. Disconnect individual steps by placing the step switches in the OFF
position and/or disconnect all load simultaneously by placing the Master
switch in the OFF position.
vi. “Step” and “Shock” loading can be used in conjunction with one another
during testing.
vii. Repeat tests as needed.
d. Acuvim II Power Quality Meter
i. Press the “VA” button on the front of the meter to view and cycle through
the line voltage and current options.
ii. Press the “P” button on the front of the meter to view and cycle through
the Power Reading and Power Factor options.
iii. You will find more detailed instructions on the use of your meter by
visiting
https://accuenergy.com/
and creating an Accuenergy account.
e. Shut Down
i. Ensure the Master switch and all step switches are in the OFF position.
ii. Allow blower(s) to operate for at least three minutes (or until exhaust air
is cool) before shutting them off.
This cooling period will extend the life of your load bank.
iii. Turn the Main Power Switch to the OFF Position.
iv. De-energize the external power source (if applicable) and the load power
source.
v. Remove the
de-energized
external power source cable.
vi. Remove the
de-energized
load power Cam Locks from the unit (if
applicable).
vii. Remove the ground Cam Locks from the unit (if applicable).
viii. Remove Ethernet/Data connections (if applicable).