
EAS15-806-GB.doc
EAS 15 - 806
REV.1-07/11
2.3- Installation
2.4- Power electrical connections
2.5- Power ON and first start up
The non observance of the indications given about the first starting of the product, can cause faulty situations on the same product
Before the first starting of the panel, check that the indications on the “Identification data plate” are in accordance with the
characteristics of the present electrical system.
The programmation of the time is needed
Ø= 6mm
245mm
Free space of
aeration reason =
min. 20cm all around
the switchboard
Drilling template
(use the two screw anchor provided)
Internal Battery charger with fuse
FCB = F500mA
Single-phase
systems connections
Three-phase
systems connections
GENERATOR
MAINS
L N
L N
L N
LOAD
GENERATOR
MAINS
L1 L2 L3 N
LOAD
L1 L2 L3 N
L1 L2 L3 N
Single-phase system 2P
I max
min sec.
max sec
40A
2x 4mm²
2x 6mm²
Three-phase system 4P
I max
min sec
max sec
25A
1x 4mm²
1x 6mm²
Cables sections
Verify that the Emergency
button is released: if not,
rotate it in clockwise
direction to unlock it.
During the first start up,
U11 code flashes as a
reminder to programming
the clock
Push RESET button to
confirm the message, and
remove it from display
Содержание EAS 15-806
Страница 27: ......