311822
12
Operation
Initial Startup Preparation
Every GCRS 40-40 T4F is tested at the factory before
shipment. This testing assures that the unit is
operating properly and that the generator and
compressor will deliver its rated capacity. Regardless
of the care taken at the factory, there still exists a
possibility that damage may occur during shipment.
For this reason, it is recommended that the unit be
carefully inspected for evidence of damage during
shipment. The unit is shipped with the positive battery
cable removed. The positive battery cable will need
to be connected before starting.
Pre-Start-up Inspection Checks
This inspection should be done prior to the
compressor test.
I. Unpack and inspect unit thoroughly upon
delivery for any unseen damage during transit.
II. Check all assemblies, clamps, fittings, hose
connections, nuts, and bolts to ensure they are
properly tied and secured to the vehicle. This
is a very critical area of inspection. The
vehicle should not be moved until this
inspection has been completed.
III. Remove all tools, rags, and installation
equipment from the area.
IV. Check compressor oil level and check valves
to ensure they're in the correct position.
V. Check belt tension. Proper belt tensioning is
1/4” deflection @ 2.89 lbf to 4.29 lbf per
strand. (For banded belts, like the one
supplied with the unit, the belt tensioning
should be 1/4” deflection @ 5.78 lbf to 8.58
lbf total.)
Operating Procedure
I. Read this manual carefully before proceeding.
II. Verify the service valve is closed, and
generator loads are disconnected.
III. Start the engine
IV. Allow 3-5 minutes for engine to warm-up.
V. Open service valve or engage generator and
connect electrical equipment
Shutdown Procedure
I. Close service valve, and disconnects all
generator loads.
II. Turn switch key o
ff
III. The engine will idle for 45 seconds before
shutting down completely
Operating Conditions
The following conditions should exist for maximum
performance of the compressor:
●
The machine should be as close to level as
possible when operating. The machine should
not exceed 10° in any direction .
●
Ambient temperature for operation should be
below 120°F (49°C). The
machine
may
experience high temperature shutdown above
this level.
●
Ambient temperature for operation should be
above 0°F (-18°C).
Содержание GCRS-40-40 T4F
Страница 2: ...311822 2 ...
Страница 7: ...311822 7 Installation 1 PHASE REMOTE METER PANELWIRING 3 PHASE REMOTE METER PANELWIRING ...
Страница 14: ...311822 14 DISPLAY PANEL ...
Страница 15: ...311822 15 DISPLAY PANEL ...
Страница 17: ...311822 17 Specifications ...
Страница 26: ...311822 26 Replacement Parts ...
Страница 27: ...311822 27 Compressor Replacement Parts ...
Страница 34: ...311822 34 Warranty Mail to PO BOX 1519 Antigonish Nova Scotia Canada B2G 2L8 Phone 647 393 1212 ...