background image

The Specialist In Drum Handling Equipment

Model 400A-60-124

Hydra-Lift, 60”, Air Power Lift, Manual Tilt

Operator’s Manual for Morse Hydra-Lift Karrier Model 400A-60-124

Serial Number 1210 to ____ (MMYY)

morsedrum.com

Copyright 2022 - Morse Mfg. Co., Inc. 

 

Form OM400-60-124 (1210-____)   

(Updated 3 Mar, 2022)

 

4

Figure 2.3

WARNING

 - Watch Out for Pinch Points

Stay clear of moving parts.  Operator should 

remain behind the push handle during the 

lift operation.

Floor Lock

The screw-down floor lock is located on the base of the tower 

(figure 3.1).  Turning the floor lock clockwise until it locks in the 

down position activates the floor lock.  When the floor lock is 

activated it prevents unwanted free wheeling of the unit.  Floor 

conditions determine the effectiveness of the floor lock.  The 

operator should verify its holding action before depending on it to 

hold.

Drum Holder Assembly

The MORCINCH

TM

 Drum Holder (Saddle) assembly is the 

component on intended to hold the drum.  It is designed to secure 

a standard ribbed 55-gallon (210 liter) steel drum around it’s middle 

using a cinch chain and ratchet tightening system.  It automatically 

adjusts for 22” to 23.5” (56 to 59.7 cm) diameter drum.

The MORCINCH

TM

 Drum Holder also accepts accessories to 

handle a plastic drum, fiber drum, or a smaller diameter drum.

Figure 3.1

Controls

The Morse Hydra-Lift Karrier is manually propelled and steered. The drum lift is 

powered by an air motor with an on/off valve. There are two functions for the operator 

to control (Figure 2.3):

1. 

LIFT and Lower Function to raise and lower the drum

• 

Plug your air line into the on/off air valve.

• 

Turn the motor on by holding the valve handle in the on position. The drum will 

lift.

• 

Release the valve handle when the drum is at the desired height.

• 

To lower the drum: With the motor off, push in the LOWER handle.

 

2.  TILT Function to control the degree of rotation of the drum.

• 

Turn the hand crank to turn the drum.

• 

Before releasing your grip on the hand crank, pull out the crank stop pin to block 

the hand crank from spinning freely.

• 

If the drum handler is equipped with the MORStop Tilt-Brake, there is no need 

to use the stop pin. Braking is immediate and self-actuating, without additional 

steps by the operator.

Note: To add the MORStop Tilt-Brake to an existing drum handler, order part # 3900-

P for a field installation kit.

Содержание 400A-60-124

Страница 1: ... keeping a digital camera at your receiving dock for this purpose Open packages expeditiously to check the condition of the goods There is only a 24 hour window to notify the carrier of any concealed damage IMMEDIATELY REPORT ALL DAMAGE TO THE SHIPPING COMPANY Then you may contact Morse for assistance with your freight claim Morse Manufacturing will not be held responsible for any damaged freight ...

Страница 2: ...only on clean level floors of suitable bearing capacity Do not use on sloped surfaces ramps irregular or debris strewn floors WARNING Do Not Modify the Unit Under no circumstances should any modifications be made to the Morse machinery without factory authorization Any modifications may void the warranty This machine was designed to perform a specific job and alterations may result in injury to op...

Страница 3: ...manual tilt drum handler 55 30 Series Diameter Adapters for drum with diameter smaller than 22 56 cm To handle a smaller drum insert the correct size Diameter Adapter into the standard drum holder See Diameter Adapter info at https morsedrum com products diameter adapters ONLY Diameter Adapters for drum with 17 5 44 5 cm diameter or smaller have integrated brackets to prevent drum slipping length ...

Страница 4: ... cinch chain and ratchet tightening system It automatically adjusts for 22 to 23 5 56 to 59 7 cm diameter drum The MORCINCHTM Drum Holder also accepts accessories to handle a plastic drum fiber drum or a smaller diameter drum Figure 3 1 Controls The Morse Hydra Lift Karrier is manually propelled and steered The drum lift is powered by an air motor with an on off valve There are two functions for t...

Страница 5: ...h chain from the ratchet by applying pressure to the ratchet handle in a clockwise direction with one hand and opening the pawl to free the ratchet with the other hand Remove the cinch chain link from the ratchet Figure 3 2 Operating Instructions 1 Push Hydra Lift Karrier to the drum 2 Using LIFT control as described in Machine Description Controls position drum holder assembly with back band at m...

Страница 6: ...roper function Inspect the hydraulic system for oil drips hose damage or other signs of wear Inspect the level and condition of the hydraulic fluid Replace any parts that show signs of wear Grease wheel bearings periodically Oil or grease all moving parts including the three clevis pins and the surfaces of the boom which contact the inside of the mast cap the hinge pin the gears and sprockets in t...

Отзывы: