The Specialist In Drum Handling Equipment
MODEL 400A-72
Hydra-Lift, 72”, Manual Lift & Tilt
Operator’s Manual for Morse Hydra-Lift Karrier with Manual Lift and Tilt
Model 400A-72 Serial Number 0409 to 1110 (MMYY)
MorseDrum.com
Copyright 2010 - Morse Mfg. Co., Inc.
Form OM400A-72 (0409-1110)
(Updated November 8, 2010 3:54 PM)
4
WARNING
- Watch Out for Pinch Points
Stay clear of moving parts. Operator should remain behind the push handle during the lift operation.
Floor Lock
The screw-down floor lock is located on the base of the tower (figure
3.1). Turning the floor lock clockwise until it locks in the down position
activates the floor lock. When the floor lock is activated it prevents
unwanted free wheeling of the unit. Floor conditions determine the
effectiveness of the floor lock. The operator should verify its holding
action before depending on it to hold.
MORcinch Drum Holder Assembly
The drum holder assembly (or “saddle assembly”) is the component
on the Hydra-Lift Karrier that is intended to hold the drum. The
MORcinch drum holder assembly is designed to secure a standard
ribbed 55-gallon steel drum around it’s middle using a cinch chain
and ratchet tightening system. The MORcinch drum holder accepts
accessories for handling a plastic drum, a fiber drum, or smaller
diameter drums (see Options on pg. 3).
Figure 3.1