background image

Page 21

MD38-DV-2  Homefire

Part No. XG0111

Appendix B - Termination Locations

A = clearance to the termination frame above grade, veranda, porch, deck, or

balcony [16 inches (41 cm) minimum]

B = clearance to door, or sides and top of window, that may be opened [16

inches (41 cm) minimum for appliances 

100 000 BTU/H (30kW)]

C = clearance to bottom of  window that may be opened horizontally [36 inches

(92 cm) minimum for appliances 

100 000 BTU/H (30kW)]

D = no clearance to permanently closed window when installed with approved

glass penetration termination

E  = clearance to permanently closed  window [16 inches 41 cm recommended

to prevent condensation on window]

F  = vertical clearance to ventilated soffit located above the termination within a

horizontal distance of 2 feet (61 cm) from the centreline of the termination
[22 inches (56 cm) minimum]

G  = clearance to unventilated soffit

[16inches (41 cm) minimum to non-combustibles]
[22 inches (56 cm) minimum to combustibles]

H = clearance to outside corner [9 inches (23 cm) minimum]

I  =

clearance to inside corner [12 inches (31 cm) minimum]

J = * not to be installed above a meter/regulator assembly within

40" (103 cm) horizontally from the centreline of the regulator

K = clearance to service regulator vent outlet [3 feet  minimum in the United

States] [*6 feet  (1.8 m) minimum in Canada]

= clearance to nonmechanical air supply inlet to building or the combustion

air inlet to any other appliance [16 inches (41 cm) minimum for appliances

100 000 BTU/H (30kW)]

M = clearance to mechanical air supply inlet

[*6 feet  (1.8 m) minimum]

N = † clearance above paved sidewalk or a paved driveway located on

public property [*7 feet (2.1 m) minimum]

P  = clearance under veranda, porch, deck, or balcony

[16 inches (41 cm) minimum‡ to non-combustibles]
[22 inches (56 cm) minimum‡ to combustibles]

Q  = clearance above a roof [24 inches (61 cm) minimum]

R = clearance to adjacent walls and neighbouring buildings

[18 inches (46 cm) minimum]

S  = clearance from corner in recessed location

[12 inches (31 cm) minimum]

T  = maximum depth in recessed location

 [48 inches (122 cm) minimum]

U = minimum width for back wall of recessed location

 [24 inches (61 cm) minimum]

V  = no horizontal clearance between the frames of two terminations that are

level.

W = horizontal clearance between the frames of two terminations that are

not level.  [36 inches (92 cm) minimum]

a vent shall not terminate directly above a sidewalk or paved driveway
which is located between two single family dwellings and serves both
dwellings

only permitted if veranda, porch, deck, or balcony has an open side that
is equal to or greater than the depth of the enclosed area

*

as specified in CGA B149 Installation Codes. Note: local Codes or
Regulations may require different clearances

Содержание Homefire plus MD38-DV-2

Страница 1: ...hbor s phone Follow the gas supplier s instructions If you cannot reach your gas supplier call the fire department Warning Improper installation adjustment altera tion service or maintenance can cause injury or property damage Refer to this manual Forassistanceoradditionalinfor mationconsultaqualifiedinstaller service agency or the gas supplier For Your Safety Do not store or use gasoline or other...

Страница 2: ...d be done by a qualified contractor Installations in Canada must conform to the current CAN CGA B 149 1 and 2 Gas Installation Code and local regulations If the optional air circulating fan kit is installed it must be electrically grounded in accordance with CSA C22 1 Canadian Electrical Code Part 1 and or Local Codes Installations in the USA must conform to local codes or in the absense of local ...

Страница 3: ...learances Theseclearancesapplytoalldimensions except the framed opening where the clearance to combustibles is 0 The MD38 DV 2 clearances to combustible materials are Top Rear Vent 7 Top Top Vent 32 Back 0 Side 1 Floor 0 Mantle 12 Clearancefromthetopofthefireplacetoacombustible ceilingwithinthefireplaceenclosure Refertopage10 If the standard elbow MEL90 is used with the Low ClearanceSleeve CRS30 t...

Страница 4: ...ssure of 10 W C Provision must also be made for a 1 8 N P T plugged tapping and be accessible for test gauge connection immediately upstream of the gas supply controls to the appliance The fireplace gas connection and the main operating gas valve is located behind the removable brass trim at the bottom of the unit and need only be attached to the gas line with an approved fitting as required by th...

Страница 5: ...1 Frame the termination opening to 12 x 12 2 Fasten the MOSR frame to the interior side of the studs using a minimum of 4 screws 3 Insert the termination into the MOSR frame as shown here and attach by screwing through the four pilot holes in the termination MSR MTO 3 MTO 3F MTO 3 MTKOG 1 Ensure that the two long mounting brackets are facing the bottom of the termination See inset This will provid...

Страница 6: ...e vent termination is 84 this would NOT be an acceptable installation Figure 7 Venting Graph Figure 8 Heat Shield Install by sliding over the vent pipe where it passes through combustible construction Heat Shields Due to high flue temperatures heat shields are required on all 38 Series Modular Direct Vent installations except those with vertical terminations at the point where the venting connects...

Страница 7: ...o outside wall and a minimum of 7 6 when retracted in opposite direction see Figure 10 and 11 D flex sections and E solid sections may be used in conjunction with one another to obtain different possible horizontal length installations NOTE Flexsectionwithnoverticalrisemustnotexceed maximum horizontal length of 3 feet see Figure 12 Flex runs over 3 feet must fall within the limits set by the venti...

Страница 8: ...measured center to center of piping Example Typicalventinstallation 20 verticalvent 2 2 offsets required 25 of 20 5 max offset allowed Thisventingconfigurationmeetsrequirements A Termination MVTK 1 B Flex sections MFL 1 12 section MFL 2 24 section MFL 3 36 section MFL 4 48 section C Solid sections MEXT 1 12 section MEXT 2 24 section MEXT 3 36 section MEXT 4 48 section D Support Ring Plate MSPXT 8 ...

Страница 9: ...ion The height from the hearth to the center of the termination is 28 MD38 DV 2 Rear Vent versions are supplied with an 18 extension pipe EXT 18 with female female connections For shorter installations cut the EXT 18 to the desired length For extended installations use the EXT 18 section as supplied for an 18 vent run Note For Rear Vent models maximum horizontal run with no vertical lift must neve...

Страница 10: ...imension from the hearth is 90 and the horizontal run to the wall flange of the vent termination is 126 this would be an acceptable installation Example C Unacceptable Installation If the vertical dimension from the floor of the fireplace is 78 and the horizontal run to the wall flange of the vent termination is 108 this would NOT be an acceptable installation Figure 18a MD38 DV 2 Rear Vent Ventin...

Страница 11: ...ire hazard prevention to combustible materials New technology to meet consumer and government demands for the wise use of energy has prompted us to manufacture many models of fireplaces which are hot fuel and energy efficient Please be aware temperatures over the mantel will rise above normal room temperature and walls above fireplace may be hot to touch We recommend careful consideration be given...

Страница 12: ...rt INSET 1 Tab INSET 2 Mounting Bracket Fresh Air Flex 4 dia High temp silicone seal Venting Plate Front Slot Installation Figure 21a Wiring for optional air circulating fan kit G L2 WH L1 BLK Quick Connect plug to motor Wiring for the optional Fan Kit All 38 Series Modular fireplaces may be equipped with optional fan or blower kits for circulating heat into the living space Installations in Canad...

Страница 13: ...surface of the logs will crack due to the heat from the flames This is a normal occurance Log D Log E Log A Log C Log B Installing the Log Set Installing the Logs The MD38 DV 2 is supplied with six ceramic fibre logs Unpack the logs and handle them very carefully 1 Remove the door cover and the glass door 2 Place the Back log onto the back log rest as shown below in figure 24a The log has lip on t...

Страница 14: ...p on See figure 25 Figure 24b Proper log placement Installation Operation Lighting Instructions See pages 15 and 16 Burner Adjustment The MD38 DV 2 Homefire Plus is equipped with adjustable burners allowing you to raise or lower the flames Operating the control knob as described below will adjust both the main burner and the ember burner n To raise the flame height turn the black knob located behi...

Страница 15: ...ion Model MD38 DV 2 3 Push in gas control knob slightly and turn clockwise to Off Do not force 4 Flip up lower trim 1 Turn off remote switch 2 Flip down lower trim 1 STOP Read the safety information above on this label 2 Flip down lower trims 3 Push in gas control knob and turn clockwise to OFF 4 Wait five 5 minutes to clear out any gas Smell for gas including near the floor If you then smell gas ...

Страница 16: ...o light any appliance n Do not touch any electrical switch do not use any phone in your building n Immediately call your gas supplier from a neighbour s phone Follow the gas supplier s instructions 1 Turn off remote switch 2 Flip down lower trim 3 Turn the switch on the gas control to Off 4 Flip up lower trim 1 STOP Read the safety information above on this label 2 Flip down lower trims 3 Turn swi...

Страница 17: ...ny film which is a normal biproduct of combustion which may be visible Film can easily be removed by removing the door as shown on page 13 Handle the door carefully and clean it with non abrasive glass cleaners One of the most effective products is Kel Kem n Silicone seals on inner door during initial firing will off gas leaving a visual deposit of a white substance on combustion chamber walls Thi...

Страница 18: ...rms up and glows red Pilot Valve opens Turn gas on Pilot Burner lights Main Valve opens SYSTEM OK Unplug Pilot Burner Cable Measure Voltage at SV9500 SV9600 HSI Terminals 24 VAC Nominal See INSET Replace Igniter Flame Rod Assembly Replace Igniter Flame Rod Assembly Replace SV9500 SV9600 Measure Voltage to SV9500 SV9600 Voltage must be at least 19 5 VAC Discard old Igniter Flame Rod Assembly Replac...

Страница 19: ...afirehazard Limitations On Liability Limitations On Liability Limitations On Liability Limitations On Liability Limitations On Liability ItisexpresslyagreedandunderstoodthatTheCompaniessoleobligation andpurchaser sexclusiveremedyunderthisWarranty underanyotherwarranty expressed orimplied orincontract tortorotherwise shallbelimitedtoreplacement repair orrefund asspecifiedabove InnoeventshallTheComp...

Страница 20: ...ilable Options and Accessories 1 Add on Bay Window 2 Hand Held Remote Control 3 VariableSpeedBlowerKit 4 4 Fan Kit 5 4 PiecePictureFrameSurround PFS 6 3 PiecePictureFrameSurround PFO 7 DoorCover Square DF0 8 DoorCover Arched DFA 9 Horizontal Trim Kits Black Brass Nickel 10 ReplacementLogset ...

Страница 21: ...ted States 6 feet 1 8 m minimum in Canada L clearance to nonmechanical air supply inlet to building or the combustion air inlet to any other appliance 16 inches 41 cm minimum for appliances 100 000 BTU H 30kW M clearance to mechanical air supply inlet 6 feet 1 8 m minimum N clearance above paved sidewalk or a paved driveway located on public property 7 feet 2 1 m minimum P clearanceunderveranda po...

Страница 22: ...Canadian Heating Products Inc Langley BC V4W 4A1 Montigo Del Ray Corp Ferndale WA 98248 XG0111 Rev 8 07 02 ...