background image

Page 8

ME38-DV-2 Homefire

Part No. XG0110

2' min.

Storm collar

Support ring

Roof flashing

30' max.

* Minimum 1" clearance to all combustibles

Support plate

Firestop

Installation

B. Vertical (Through-The-Roof) Installations

n

Vertical Terminations must be installed:

minimum 2' (two feet) above the highest point where
vent passes through the roof.

minimum 6' (six feet) from a mechanical air inlet

minimum 18" (1 1/2 feet) from a parapet wall.

n

Maximum vent height is 35 feet above fireplace.
Note: Flame characteristics will change if the maximum vent height
is used.

n

Minimum clearances 1" from vent to all combustible materials must
be maintained.

Figure 13.

 Straight, vertical venting using

 required MXT-10 adaptor.

n

A maximum of two offsets (each offset has two 90° bends) may be
made and shall not exceed total length of 25% of the vertical vent height,
when measured center to center of piping.

Example:

Typical vent installation.
20' vertical vent
2 - 2' offsets required
25% of 20' = 5' max. offset allowed

This venting configuration meets requirements.

A - Termination

MVTK-1

B - Flex sections

MFL-1 (12" section)

MFL-2 (24" section)

MFL-3 (36" section)

MFL-4 (48" section)

C - Solid sections

MEXT-1 (12" section)

MEXT-2 (24" section)

MEXT-3 (36" section)

MEXT-4 (48" section)

D - Support Ring & Plate

MSPXT-8 (7" dia.)

E - Firestop

FS-7 (7" dia.)

F - Roof Flashing

MRF-7 (1/12 - 7/12 pitch)

MRF-12 (7/12 - 12/12 pt.)

MRF-16 (12/12 - 16/12 pt.)

Figure 14b.

 Vertical venting with 2 offsets (1 offset= two 

90° bends).

Figure 14a.

 Vertical venting with 1 offset (1 offset= two 

90° bends).

2' min.

2'

Storm collar

Roof flashing

30' max.

* Minimum 1" clearance to all combustibles

Support straps or
support plate & ring

Firestop

Firestop

Firestop

Support plate
& ring

35' max.

35' max.

Top Vent

Storm collar

Support ring

MEXT
Solid Section

Roof flashing

30' max.

* Minimum 1" clearance to all combustibles

Support plate

Firestop

Firestop

2' min.

MXT-10

Adaptor

MEXT

Flue

Collar

35' max.

Содержание Homefire ME38-DV-2

Страница 1: ...bor s phone Follow the gas supplier s instructions If you cannot reach your gas supplier call the fire department Warning Improper installation adjustment alteration serviceormaintenancecancause injury or property damage Refer to this manual For assistance or additional information consult a qualified installer service agency or the gas supplier For Your Safety Do not store or use gasoline or othe...

Страница 2: ...e done by aqualifiedcontractor Installations in Canada must conform to the current CAN CGA B 149 1 and 2 Gas Installation Code and local regulations If the optional air circulatingfankitisinstalled itmustbeelectricallygroundedin accordance with CSA C22 1 Canadian Electrical Code Part 1 and or LocalCodes Installations in the USA must conform to local codes or in the absense of local codes to the Na...

Страница 3: ...framing depth may be reduced to 14 3 4 37 3 4 15 1 2 40 3 4 43 7 8 24 1 8 0 clearance to corners only Framing WARNING When this appliance is installed directly on carpeting tile or any combustible material other than wood flooring it must be installed on a metal or wood panel extending the full width and depth of the appliance 14 3 4 28 3 4 34 3 4 Ø7 Ø4 14 3 4 38 33 Ø7 C Ø4 5 1 2 Top Vent Front Vi...

Страница 4: ...nifold pressure of 10 W C Provision must also be made for a 1 8 N P T plugged tappingandbeaccessiblefortestgaugeconnectionimmediately upstream of the gas supply controls to the appliance The fireplace gas connection and the main operating gas valve is located behind the removable brass trim at the bottom of the unit and need only be attached to the gas line with an approved fitting as required by ...

Страница 5: ...1 Frame the termination opening to 12 x 12 2 Fasten the MOSR frame to the interior side of the studs using a minimum of 4 screws 3 Insert the termination into the MOSR frame as shown here and attach by screwing through the four pilot holes in the termination MSR MTO 3 MTO 3F MTO 3 MTKOG 1 Ensure that the two long mounting brackets are facing the bottom of the termination See inset This will provid...

Страница 6: ...the floor of the fireplace is 72 and the horizontal run to the wall flange of the vent termination is 84 this would NOT be an acceptableinstallation Figure 7 Venting Graph Figure 8 Heat Shield Install by sliding over the vent pipe where it passes through combustible construction Heat Shields Due to high flue temperatures heat shields are required on all 38 Series Modular Direct Vent installations ...

Страница 7: ...in opposite direction see Figure 10 and 11 D flex sections and E solid sections may be used in conjunction with oneanothertoobtaindifferentpossiblehorizontallengthinstallations NOTE Flex section with no vertical rise must not exceed maximum horizontal length of 3 feet see Figure 12 Flex runs over 3 feet must fall within the limits set by the venting graph and must have a minimum vertical rise of 3...

Страница 8: ...measured center to center of piping Example Typicalventinstallation 20 verticalvent 2 2 offsets required 25 of 20 5 max offset allowed Thisventingconfigurationmeetsrequirements A Termination MVTK 1 B Flex sections MFL 1 12 section MFL 2 24 section MFL 3 36 section MFL 4 48 section C Solid sections MEXT 1 12 section MEXT 2 24 section MEXT 3 36 section MEXT 4 48 section D Support Ring Plate MSPXT 8 ...

Страница 9: ...ion The height from the hearth to the center of the termination is 28 ME38 DV 2 Rear Vent versions are supplied with an 18 extension pipe EXT 18 with female female connections For shorter installations cut the EXT 18 to the desired length For extended installations use the EXT 18 section as supplied for an 18 vent run Note For Rear Vent models maximum horizontal run with no vertical lift must neve...

Страница 10: ...on from the hearth is 90 and the horizontal run to the wall flange of the vent termination is 126 this would be an acceptable installation ExampleC UnacceptableInstallation If the vertical dimension from the floor of the fireplace is 78 and the horizontal run to the wall flange of the vent termination is 108 this would NOT be an acceptableinstallation Figure 18a ME38 DV 2 Rear Vent Venting Graph 0...

Страница 11: ...re hazard prevention to combustible materials New technology to meet consumer and government demands for the wise use of energy has prompted us to manufacture many models of fireplaces which are hot fuel and energy efficient Please be aware temperatures over the mantel will rise above normal room temperature and walls above fireplace may be hot to touch We recommend careful consideration be given ...

Страница 12: ...rt INSET 1 Tab INSET 2 Mounting Bracket Fresh Air Flex 4 dia High temp silicone seal Venting Plate Front Slot Installation Figure 21a Wiring for optional air circulating fan kit G L1 WH L2 BLK Quick Connect plug to motor Wiring for the optional Fan Kit All 38 Series Modular fireplaces may be equipped with optional fan or blower kits for circulating heat into the living space Installations in Canad...

Страница 13: ...ith six ceramic fibre logs Unpack the logs and handle them very carefully 1 Remove the door cover and the glass door 2 Place the Back log onto the back log rest as shown below in figure 24a The log has lip on the bottom which fits into the slot on the log rest Figure 24a Positioning for the front and back logs Log D Log E Log A 3 Place the Front log onto the front log rest as shown in figure 24a C...

Страница 14: ... trim will snap on See figure 25 Figure 24b Proper log placement Operation Lighting Instructions See pages 15 and 16 Burner Adjustment The MD34 DV 2 fireplace is equipped with an adjustable burner allowing you to raise or lower the flames Operating the control knob as described below will adjust both the main burner and the ember burner n To raise the flame height turn the black knob located behin...

Страница 15: ...ion Model ME38 DV 2 3 Push in gas control knob slightly and turn clockwise to Off Do not force 4 Flip up lower trim 1 Turn off remote switch 2 Flip down lower trim 1 STOP Read the safety information above on this label 2 Flip down lower trims 3 Push in gas control knob and turn clockwise to OFF 4 Wait five 5 minutes to clear out any gas Smell for gas including near the floor If you then smell gas ...

Страница 16: ... light any appliance n Do not touch any electrical switch do not use any phone in your building n Immediately call your gas supplier from a neighbour s phone Follow the gas supplier s instructions 1 Turn off remote switch 2 Flip down lower trim 3 Turn the switch on the gas control to Off 4 Flip up lower trim 1 STOP Read the safety information above on this label 2 Flip down lower trims 3 Turn swit...

Страница 17: ...emove any film which is a normal biproduct of combustion which may be visible Film can easily be removed by removing the door as shown on page 13 Handle the door carefully and clean it with non abrasive glass cleaners One of the most effective products is Kel Kem n Silicone seals on inner door during initial firing will off gas leaving a visual deposit of a white substance on combustion chamber wa...

Страница 18: ...rms up and glows red Pilot Valve opens Turn gas on Pilot Burner lights Main Valve opens SYSTEM OK Unplug Pilot Burner Cable Measure Voltage at SV9500 SV9600 HSI Terminals 24 VAC Nominal See INSET Replace Igniter Flame Rod Assembly Replace Igniter Flame Rod Assembly Replace SV9500 SV9600 Measure Voltage to SV9500 SV9600 Voltage must be at least 19 5 VAC Discard old Igniter Flame Rod Assembly Replac...

Страница 19: ...ltinafirehazard Limitations On Liability Limitations On Liability Limitations On Liability Limitations On Liability Limitations On Liability ItisexpresslyagreedandunderstoodthatTheCompaniessoleobligation andpurchaser sexclusiveremedyunderthisWarranty underanyotherwarranty expressed orimplied orincontract tortorotherwise shallbelimitedtoreplacement repair orrefund asspecifiedabove InnoeventshallThe...

Страница 20: ...Options and Accessories 1 Add onBayWindow 2 Hand HeldRemoteControl 3 Cross Flow Blower Kit 4 4 Fan Kit 5 4 PiecePictureFrameSurround PFS 6 3 PiecePictureFrameSurround PFO 7 DoorCover Square DF0 8 DoorCover Arched DFA 9 Horizontal Trim Kits Black Brass Nickel 10 ReplacementLogset 2 4 5 10 ...

Страница 21: ...ted States 6 feet 1 8 m minimum in Canada L clearance to nonmechanical air supply inlet to building or the combustion air inlet to any other appliance 16 inches 41 cm minimum for appliances 100 000 BTU H 30kW M clearance to mechanical air supply inlet 6 feet 1 8 m minimum N clearance above paved sidewalk or a paved driveway located on public property 7 feet 2 1 m minimum P clearanceunderveranda po...

Страница 22: ...Canadian Heating Products Inc Langley BC V4W 4A1 Montigo Del Ray Corp Ferndale WA 98248 XG0110 Rev 8 07 02 ...

Отзывы: