Page 5
ME38-DV-2 Homefire
Part No. XG0110
Installing Terminations with Built-In Frames
Installing Terminations with MSR Frames
12
12
1. Frame the termination opening to 12" x 12".
2. Fasten the termination to the studs using a minimum of 4 screws.
11
11
1.
Frame the termination opening to 11" x 11".
2.
Fasten the termination to the studs using a minimum of 4
screws.
Installing Terminations with MOSR Frames
12
12
12
MOSR
1.
Frame the termination opening to 12" x 12".
2.
Fasten the MOSR frame to the interior side of the studs using a
minimum of 4 screws.
3.
Insert the termination into the MOSR frame as shown here, and
attach by screwing through the four pilot holes in the termination.
MSR
MTO-3
MTO-3F
MTO-3
MTKOG
1.
Ensure that the two
long
mounting brackets are facing the
bottom of the termination. (See inset). This will provide more
heat protection at the top of the termination, where temperatures
are highest.
2.
Attach to the faceplate of the termination using four sheet metal
screws.
Installing Heat Guards over Terminations
Installation