© 2011 Monte Carlo Fan Company
4/20/2012
3
Before you begin installing the fan, Switch power off
at Service panel and lock service disconnecting means
to prevent power from being switched on accidentally.
When the service disconnecting means cannot be
locked, securely fasten a prominent warning device,
such as a tag, to the service panel.
1
Install canopy and yoke cover over
the downrod. Thread wire through
downrod with canopy and yoke cover
assembled.
6
Warning
-Risk of fire, electric shock, or person-
al injury. The fan in this box may be either
directly supported from a structural framing
member of a building and/or may be mounted
to an outlet box marked acceptable for fan sup-
port of of 16 kg (35 lbs) or less. Most outlet
boxes commonly used for the support of lummi-
naires may not be acceptable for fan support
and may need to be replaced. Consult a quali-
fied electrician if in doubt.
2
OUTLET BOX METHOD
Loosen the 2 set screws. You should
be able to put your downrod into the
yoke.
5
Remove the keeper pin and cotter
pin.
4
Install the Mountiing Bracket to the
Outlet box.
Use only the screws
provided with the outlet box.
3
Insert downrod into motor yoke.
Next,insert clevis pin through yoke
and downrod and secure with cotter
pin.
7
8
Tighten both yoke set screws to fur-
ther secure downrod.
Install the two thumbscrews to
secure the yoke cover. Tighten
securely.
9