© 2011 Monte Carlo Fan Company
2/10/2012
3
Place canopy and then yoke cover over downrod
as shown. Then thread the lead wires and safe-
ty cable from fan through the downrod as
shown.
Before you begin installing the fan, Switch power off
at Service panel and lock service disconnecting means
to prevent power from being switched on accidentally.
When the service disconnecting means cannot be
locked, securely fasten a prominent warning device,
such as a tag, to the service panel.
Before installing this fan make sure the outlet
box is properly installed to the house structure.
To reduce the risk of fire, electric shock, or per-
sonal injury, mount to outlet box or supporting
system acceptable for fan support.
(Mounting must support at least 35 lbs.)
Use metal outlet box suitable for fan support
(must support 35 lbs). Before attaching fan to
outlet box, ensure the outlet box is securely
fastened by at least two points to a structural
ceiling member ( a loose box will cause the fan
to wobble).
Use only the screws provided
with the outlet box.
Remove keeper from pin. Pull pin out and
replace keeper, save for later.
3
2
1
4
6
Loosen the 2 set screws and nuts till you can
not feel them on inside of yoke.
5
Keeper
Pin
7
Tighen set screws and nuts to secure
downrod in yoke.
8
Insert downrod into yoke on top of
fan body. Align the hole in the down-
rod with hole in the yoke. Insert pin
through the yoke and downrod until
the point appears on the other side.
Install the keeper.
Check the fan motor for shipping sta-
bilizer and remove if present.
9