background image

© 2011 Monte Carlo Fan Company

2/10/2012

3

Place canopy and then yoke cover over downrod

as shown. Then thread the lead wires and safe-

ty cable from fan through the downrod as

shown.

Before you begin installing the fan, Switch power off

at Service panel and lock service disconnecting means

to prevent power from being switched on accidentally.

When the service disconnecting means cannot be

locked, securely fasten a prominent warning device,

such  as a tag, to the service panel.

Before installing this fan make sure the outlet

box is properly installed to the house structure.

To reduce the risk of fire, electric shock, or per-

sonal injury, mount to outlet box or supporting

system acceptable for fan support. 

(Mounting must support at least 35 lbs.)

Use metal outlet box suitable for fan support

(must support 35 lbs). Before attaching fan to

outlet box, ensure the outlet box is securely

fastened by at least two points to a structural

ceiling member ( a loose box will cause the fan

to wobble). 

Use only the screws provided

with the outlet box.  

Remove keeper from pin. Pull pin out and

replace keeper, save for later.

3

2

1

4

6

Loosen the 2 set screws and nuts till you can

not feel them on inside of yoke.

5

Keeper

Pin

7

Tighen set screws and nuts to secure

downrod in yoke.

8

Insert downrod into yoke on top of

fan body. Align the hole in the down-

rod with hole in the yoke. Insert pin

through the yoke and downrod until

the point appears on the other side.

Install the keeper.

Check the fan motor for shipping sta-

bilizer and remove if present.

9

Отзывы: