background image

Place yoke cover over downrod.

7

8

Thread the leadwires and safety

cable through the downrod.

9

Insert downrod into the yoke on top

of fan body.  Align the hole in the

downrod with the hole in the yoke.

Insert cotter pin through yoke and

downrod until point appears on the

other side

Make sure the studs protruding from the

bottom of the Mounting bracket are

installed with threads all the way through

the bracket.  

12

Tighten the 2 set screws on the

yoke, once the down rod is in place.

11

Hang assembled fan from the mounting bracket
installed to ceiling in previous step.  Make sure the
fan is hanging straight.  Rotate fan until the tab on
the Mounting bracket engages the slot on the
Downrod Ball.  This must be done to prevent the fan
body from rotating when the blades are in motion.

13

Install keeper pin.

10

Fan and light kit combinations over 35 lbs,

in both flush and downrod mode the safety

cable must be installed into the house struc-

ture beams using the 3” lag screws,washers,

and lock washers. provided.  Make sure that

when the safety cable is fully extended the

lead wires are longer than the cable and no

stress is placed on the lead wires. 

14

Safety cable installation

Safety cable

Lag Screw

safety

cable

3” lag

screw

lock

washer

washer

Connect black and blue wire from fan to Black or (Hot)
wire from house.  Connect White wire from Fan to
White (Neutral) wire from house.  Connect Ground
leads from mounting bracket and downrod to Ground
lead from house.  

Refer to Safety Tips section of

manual.

15

Make wire connections to power source using wire nuts
provided.  Make sure that no filiments are outside of
the wirenut. After making the wire connections, the
wires should be spread apart with the grounded con-
ductor and the equipment-grounding conductor on one
side of the outlet box and ungrounded conductor on
the other side of the outlet box. The splices after being
made should be turned upward and pushed carefully
up into the outlet box. 

16

Lift canopy and install knurled nuts as

shown. Tighten the knurled nuts securely.

The canopy should adjust for any irregu-

larity in the ceiling or Outlet box.

17

Check for shipping stabilizers and remove

if present.  Attach blades using screws in

hardware pack.  

chose blade size you

like.

Tighten screws securely.  Repeat 2

more times.

18

Отзывы: