Reference 13August2014
Pg
1 of 12
Copyright 2002-2009, Monster Tower, Inc.
Installation Instructions
And Owners Manual
MT2
Monster Tower, Inc.
1704 Henry G Lane St
Maryville, TN 37801
Phone: 877-77-Tower
Fax: 877-232-6538
www.MonsterTower.com
Reference 13August2014
It is critical to lubricate bolt threads with included Anti-Seize
before installing Nylock Nuts to prevent the precision stainless steel
hardware from galling and locking, even if you are test-fitting parts together
before installation.
Leave Legs and Top Section protected with bubble wrap sleeves, removing
only the ends as needed, to protect the boat and tower during installation.
THANK YOU FOR YOUR BUSINESS. IF YOU ARE NOT COMPLETELY SATISFIED
IN ANY WAY WITH YOUR NEW MT2, PLEASE CONTACT US IMMEDIATELY. Our
entire purpose as a company is to create great products at affordable prices that
our customers love.
IMPORTANT
Please take a few minutes to read the installation instructions and become
familiar with the MT2 parts and installation before beginning to ensure a high
quality, trouble free installation. If you have any questions during your
installation give us a call at 877-77-Tower or e-mail [email protected]