background image

Page 4 

 

 

Step 4: Leg and Top Section Installation 

 

Start with the starboard side and install the 

½” x 4”

 bolt 

The head of the bolt will face inside the boat.  Before putting the bolt through the case base place the 

1 ½” 

fender washer (pc.1) against the leg so that it is between the cast base and the leg section.  Before installing 
the brass nut (pc.4) 

place the 1”

 black nylon washer (pc.3) between the brass nut and cast base.  Install the 

decorative cap (pc.10) over the brass nut. 
 
Insert the quick release knob (Pc.5) into the rear 
section of the leg and tighten all the way.  Once the 
quick release knob is secure install the set screw 
(pc.14) into the brass insert.  Tighten the set screw 
all the way to prevent the knob from coming out 
completely when lowering the tower.  
 
Once the knob and set screws are installed you can 
insert the header section onto the leg section.  Do 
not remove the protective wrap from the leg 
section until the install is complete.   
 
Insert the port leg completely into the header section and line it up with the port cast base.  Install the 

½” x 4”

 

bolt 

1 ½” fender washer (pc.1), 1” black nylon washer (pc.3), brass nut (pc.4), quick release knob 

assembly (pc.5), and set screw (pc.14) identical to the installation on the starboard side.   
 

 

Step 5: Aligning the Top Section 

 

Now that everything is installed align the top section so the holes for the locking bolts (pc.12) can be drilled.  
Using an X pattern measure from the edge of the top section to a reference on the opposite side cast base.  
Use the same reference on both sides.  Some easy references are the welds on the front of the leg or the 
bottom of the leg mounting plates.  
 
Once the top section is centered and level use the provided 10mm drill bit (pc.16) to drill through the top 
section into the leg sections.  The center pilot holes on each side of the top section are for the sound bar 
wiring harness.  If you do not plan on installing a sound bar do not drill this hole!  Be sure to drill from the top 
down and the bottom up.  This will prevent any misalignment with the bottom pilot hole thus preventing top 
section movement.  Once the first hole is drilled install the 

3/8” x 3" BHCS bolt

 (pc.12) and use the provided 

8mm allen wrench to tighten the bolt into the decorative header nut (pc.13).  The decorative header nut will 
sit flush against the top section.  Continue this step for the remaining 3 bolts and install them accordingly. 

Содержание HS1

Страница 1: ... can exceed 10 G on double ups Towing forces are transferred into the deck of the boat Monster Tower REQUIRES reinforcement to be installed under the deck by a qualified installer who can take your boat s individual mounting situation into account Every boat mounting location and configuration is unique and needs to be assessed by a fiberglass professional to ensure the forces generated from towin...

Страница 2: ...Page 2 Step 1 To ensure you are not missing any hardware layout all pieces and verify you are not missing any hardware Supplied pieces Tools Needed ...

Страница 3: ... holes for each base Be sure to drill in reverse to get through the gel coat this will prevent spider cracks from forming Once you are through the gel coat you can drill normally Determine which side of the boat the navigation light needs to run to and drill the 13 16 hole according to the template Step 3 Base Installation Remove the paper templates and place the correct rubber gasket over the mou...

Страница 4: ...nylon washer pc 3 brass nut pc 4 quick release knob assembly pc 5 and set screw pc 14 identical to the installation on the starboard side Step 5 Aligning the Top Section Now that everything is installed align the top section so the holes for the locking bolts pc 12 can be drilled Using an X pattern measure from the edge of the top section to a reference on the opposite side cast base Use the same ...

Страница 5: ... the wire through the tower to the side of the boat you drilled for the navigation light At the end of the leg pull out the wire and run it into the wire slot of the leg mounting plate In most cases the LED anchor light can be wired into the existing navigation light system ...

Страница 6: ...er to the folded position When the tower is folded always use a vest or other cushion to protect your boat where the tower and boat touch IMPORTANT The tower cannot be towed when folded The tower must be in the upright position when being towed After towing and before every use please check and tighten bolts and nuts when necessary The HS1 tower is silent by design If you hear any rattling or nois...

Отзывы: