❏
4. Apply cement to frame as shown and to ends
of support 4. Spread frame and line up square
pin on support into square hole in frame.
❏
5. Next cement coil halves 7 and 8 together,
then cement tab on coil to support.
❏
6. Cement pin on regulator 6 into old in support.
❏
7. Cement support 5 into frame with the topend
fitting into NOTCH in the top frame.
❏
8. Cement cap 50 to gas rank and two plugs 65
to rear of frame.
7541 4
2
❏
9. Now cement oil tank halves 9
H
and
10 tegether, Cut two tubes “A” to
length shown on pattern and press
boeth into ins on bottom of tank.
Cement tank to frame with “U” notch
in tank fitting against support.
❏
10. Slip (do not cement) large gear on
chain drive 11 over rear axle pin.
❏
11. Cement small gear on chain drive
onto pin on frame as shown.
❏
12. Slip (do not cement) bracket 12
onto kick stand 13
H
. Snap bracket
into square hold in frame and add
cement to back where bracket
touches frame. Make sure that the
kick stand will operate.
❏
13. Press rear tire and insert together.
❏
14. Insert wheel half 14
H
into tire.
❏
15. Next apply cement to wheel half
15
H
and press into other side of
tire. Hold wheel halves together
tightly until cement sets.
❏
16. Spread frame apart slightly and slip
(do not cement) wheel onto rear
axle pins.
3
A
A
10
E
11
E
8
B
7
B
65
E
65
E
6
E
5
C
12
C
4
C
50
E
14
H
15
H
9
H
13
H
PUSH TOP IN
NOTCH AS FAR
AS IT WILL GO
APPLY
CEMENT
NOTCH
REAR
AXLE PIN
REAR
TIRE
REAR
TIRE INSERT
SUPPORT
"U" NOTCH
TUBING PATTERN
TUBING "A" -2 REQ'D
CHAIN ONLY
A
SQUARE
HOLE
SQUARE
PIIN
A