Monkey Tower Mini 1.1 EN 1298 IM Скачать руководство пользователя страница 10

Chapter 4. Hazardous Situations

Chapter 4

Hazardous
Situations

Fall Hazards

Do not use the machine as a personnel
lifting platform. Monkey Tower is not
to be used to lift or lower people.

If occupants of the platform are re-
quired to wear personal fall protection
equipment (PFPE) due to job site or
employer rules, PFPE equipment and
its use shall be in accordance with the
PFPE manufacturer’s instructions and
applicable governmental requirements.

Do not sit, stand or climb on the plat-
form guard rails.

Maintain a firm footing on the platform
floor at all times.

Keep the platform floor clear of debris.

Ensure platform trapdoor is closed
when working.

Tip-over Hazards

Do not raise the platform unless the legs
have been fully extended, lowered and
locked, the casters are in full contact
with the ground and the base is level.

Do not impose a side load of more than
200N. Be aware of possible sideloads
arising from work (pressure blasting,
drilling etc.)

Do not raise the platform unless the
leg retainer pins are properly inserted
through the leg and the base.

Do not raise the platform unless the
machine is on a firm surface and lev-
elled.

Do not level the machine with blocks or
other means.

Do not operate the machine in strong
or gusty winds (max windspeed 17mph,
beaufort 4).

Do not increase the surface area of the
platform or the load.

Do not place ladders or scaffolding
against any part of the machine.

Do not use the machine on a moving or
mobile surface or vehicle.

Do not exceed the rated load capacity.
(See Specifications Section).

Do not adjust or remove the outriggers
while the platform is occupied or raised.

Do not place or attach overhanging
loads to any part of this machine.

User Manual

10

Monkey Tower Ltd

Содержание 1.1 EN 1298 IM

Страница 1: ... uk Scaffolding in Seconds Monkey Tower Monkey Tower Mini User Manual Version 1 1 EN 1298 IM en 01 02 2012 Monkey Tower Ltd North Wing Ingatestone Hall Ingatestone Essex CM4 9NS 01277 356172 sales monkeytower co uk Mini ...

Страница 2: ...Contents Contents 1 Safety Rules 3 2 Operating Instructions 4 3 Pre Use Inspection 7 4 Hazardous Situations 10 5 Fault Finding 13 6 Specifications 14 User Manual 2 Monkey Tower Ltd ...

Страница 3: ...equipment are provided to eliminate or minimise risks Work at Height Regulations 2005 Regula tions 6 7 8 and Schedule 3 Part 2 Do Not Operate Unless You learn and practice the principles of safe machine operation contained in this operator s manual You must 1 Know understand and follow the safety rules in this Chapter 2 Follow the operating instructions Chapter 2 3 Avoid hazardous situations Chap ...

Страница 4: ...m a pre operation inspec tion function tests and a workplace inspec tion before using the machine Setup Check that work area is suitable accord ing to the details given in the Site In spection Machinery Selection section of Chapter 3 Follow the Setup procedures in the Function Tests section Raising Platform for Use 1 Position the machine directly below the desired work area Make sure castors are l...

Страница 5: ...and slowly lower Platform will lock into position resting on runglocks 7 Check rung locks are fully en gaged If locks are not engaged repeat steps 5 to 14 Climbing Ladder Enter ing Platform Before the ladder is climbed the following checks must be made each time Check that the assembly is still correct and complete including stabiliser legs in position Check that ladder locks are locked into place...

Страница 6: ...older 3 Raise platform approximately 10 cm 4 to disengage runglocks and lower platform Moving on Castors The Monkey Tower can be moved on the the castors 1 Unlock castors by lifting castor lock by hand 2 Move Monkey Tower Mini Never move the Monkey Tower with workers on board When platform raised do not move unless ground is smooth level and free from drop offs ledges or debris If windspeed is ove...

Страница 7: ... 17 Name and position of the person making the report 18 Date and time report handed over 19 Name and position of person receiving the report Daily Pre use Inspection see maintenance manual for more information Serial Number Operators Manual Present Decals Present Damage Dirt Missing Parts Corrosion Unauthorised Changes Stabiliser Leg Function Slider Function Lock Function Door Function The pre us...

Страница 8: ...issing rivets Be sure that all structural and other criti cal components are present and all associated fasteners and pins are in place and properly tightened Stabiliser Leg Function Check the following function on all four of the stabiliser legs Soring loaded pins slide in and out of holes easily stabilisers slide horizontally without undue force Friction locks on upright hold upright in position...

Страница 9: ...reach the workplace can the workplace be reached from within the plat form Wind Speed Measurement The maximum windspeed that a freestand ing Monkey Tower shall be used in is 17mph beaufort force 4 The windspeed should be checked at the beginning of work and rechecked if any changes in the windspeed are noticed The windspeed can be measured by use of an anemometer measuring the wind speed in two pe...

Страница 10: ...e casters are in full contact with the ground and the base is level Do not impose a side load of more than 200N Be aware of possible sideloads arising from work pressure blasting drilling etc Do not raise the platform unless the leg retainer pins are properly inserted through the leg and the base Do not raise the platform unless the machine is on a firm surface and lev elled Do not level the machi...

Страница 11: ...rom electrical power lines and apparatus Allow for machine movement and electrical line sway or sag and be aware of strong or gusty winds Do not use the machine as a ground for welding Do not operate the machine during lightning or storms Crushing Hazards Do not raise or lower the platform un less the area below is clear of people and obstructions Keep hands and fingers away from po tential pinch ...

Страница 12: ... remove from ser vice a damaged or malfunctioning ma chine Any damaged parts or incorrect components shall not be used Routine Maintenance Details of routine maintenance can be seen in the Monkey Tower Maintenance Manual User Manual 12 Monkey Tower Ltd ...

Страница 13: ...tribu tor or Monkey Tower Ltd Check that there are no obstructions on the sliders or ladders Check that platform is not loaded Platform Fails to Lower Check that rung locks have been re leased Platform may need raising to release rung locks Check that rung lock cables are intact Check that there are no obstructions to the ladder slider or brace lock User Manual 13 Monkey Tower Ltd ...

Страница 14: ...Safe Working Load 150 kg Max Platform Height 1 95m Maximum Working Height 3 95m Height Increment 0 25m Wind limits Windspeed Windspeed Action mph Beaufort 0 17 0 4 Use as normal 0 21 5 Tie platform to solid structure or lower tower 21 6 Do not use and lower tower User Manual 14 Monkey Tower Ltd ...

Страница 15: ...placeholder ...

Страница 16: ...ompetent to use Monkey Tower Mini Yes No 12 Details of any matter identified that could give rise to a risk to the health or safety of any person 13 Can work be carried out safely Yes No 14 If work cannot be carried out safely name and position of person informed 15 Details of any other action taken as a result of matters identified in 12 above 16 Details of any further action considered necessary...

Отзывы: