74D0009
39
OPTIONAL FAN BLOWER SYSTEM
KT504
install blower
11/08
Engine
Cutout
KT504
Figure 55 -
Insert Blowers through
Engine Cutout
KT505
install blower
Start Position
Installed
Position
KT505
Figure 56 -
Blower Installation Position
FP1916
AC box
8/08
Screw
Guiding Block
Connector Hole
Connector Pin
Control Box
AC Box
Figure 57 - Connect AC Box to Control Box
15. Plug the AC box plug to the junction box.
16. To test blower operation. Turn the fireplace on.
Turn blower on. The blower should turn on within
five (5) minutes. Refer to the operating instruc-
tions on Signature Command remote control for
complete operation instructions.
Finishing
Re-install the lower access panel.
NOTE:
Some older units are not equipped with
mounting brackets. Velcro and magnets are used
to mount blowers to sidewall and floor.
Содержание Direct Vent BLDV400
Страница 54: ...54 74D0009 2 3 4 5 6 7 illustrated parts lists firebox components ...
Страница 56: ...56 74D0009 illustrated parts lists 1 2 3 4 5 6 7 8 10 11 12 13 14 Standing Pilot Millivolt control 2T 2I 2C 8 ...
Страница 58: ...58 74D0009 illustrated parts lists SIGNATURE COMMAND SYSTEM 0009 SG parts 8 08 1 2 3 4 17 5 6 7 8 9 13 14 15 ...
Страница 65: ...74D0009 65 ...
Страница 66: ...66 74D0009 ...
Страница 68: ...68 74D0009 NOVEMBER 2008 74D0009 Rev 11 MHSC 149 Cleveland Drive Paris Kentucky 40361 www mhsc com ...